Top-rated garage pros.

Get matched with top garage pros in Ash, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your garage service project in Ash, NC?

Select your specific project to find the pro for you.

Find Garage pros in Ash

Avatar for Advantage Construction
Advantage Construction
4.6(
66
)

Serving Ash, NC and surrounding areas

Approved

In business since 1988

Free estimates

Warranties offered

"Awesome! Professional, responsive, trustworthy, fair, good communication, excellent work results in everything done from drywall, painting to room addition."
Response time4 days
6 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for AMC East Coast Remodeling
AMC East Coast Remodeling
5.0(
12
)

Serving Ash, NC and surrounding areas

Emergency services offered

Credit card accepted

Our mission is to be a provider that brings back the personal touch with our customers. We will build a relationship that will last a lifetime after you see our quality work. As a locally owned and operated business we feel invested in our clients and constantly strive for customer satisfaction. Call or message us to schedule an estimate today!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+164

Recommended by100%of homeowners
Avatar for Consolidated Roofing Systems, Inc.
Consolidated Roofing Systems, Inc.
4.7(
127
)

Serving Ash, NC and surrounding areas

In business since 1979

Free estimates

Credit card accepted

"Consolidated Roofing Systems is simply the best. From Fred and Billy and the entire crew, customer service really impressed me. I haven't seen that kind of customer service for a very long time. The workmanship is superb from start to finish. The product is definitely top of the line. I'm so glad I found this company and would certainly recommend them to anyone. Thanks for a great job!!"
Burns
Piner
Vaughn
Burns
Piner

+58

Recommended by94%of homeowners
Avatar for ABX Contracting
ABX Contracting
3.9(
79
)

Serving Ash, NC and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"David came and did a fabulous job!!!!  Arranging the job was easy with Chris at ABX Contracting.  David came on time, cut and replaced the wood efficiently and neatly.  He took the old wood and helped with a problem with a window that no one had been able to help me with for two years.  I am very pleased with the work and will definitely call them again.  I will also highly recommend them to friends.  He was very friendly, very accommodating, very efficient, very competent, very helpful, and very pleasant to work with!!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Recommended by88%of homeowners
Avatar for Craftsman Direct Handyman Home Improvement
Craftsman Direct Handyman Home Improvement
4.1(
321
)

Serving Ash, NC and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"I contacted three different providers to give quotes on adding a 12'x16' deck extension to the existing deck. This would be about 1.5 feet off the ground and covering an existing concrete slab. Craftsman contacted me and scheduled Kevin H. to come out to perform the estimate and he did so on 08-Jun-2015. Kevin's demeanor was professional and he seemed knowledgeable and focused on providing what I wanted. We received the estimate from him 3 days later for $3300-$4000 labor and $750 materials. We were told at that time that scheduling was 1-2 weeks out. While Craftsman was the highest bid, we decided to go with them because they seemed knowledgeable and slightly more "polished" than the other potential contractors, and one of the important factors for us was that they could start work in 1-2 weeks as we were eager to get the deck finished so we could do some other projects around the deck. 
On 14-Jun-2015 we sent the email accepting the proposal and on 15-Jun-2015 Kevin confirmed receipt and stated Laura would send over the contract to sign and schedule us. He re-affirmed that we were 1-2 weeks out on the schedule. Later that day, I received a follow-up email from Kevin informing me that the engineering plan they would work from is my responsibility and provided me with the name of an engineer and told me I will pay the engineer directly. This was the first time that I was told I had to separately contract, schedule, and pay for additional services outside of the bid. I was told at this time we would hold off on the contract until the engineer came out and provided a more concrete plan so the contract could be more accurate. I was assured at that time that we would keep our place in schedule so we didn't go to the end of the line. We weren't happy with this development but moved forward. 
I contacted the engineer (which I am not sure that was needed for such a small deck project) and he agreed to come to the house and meet me on 16-Jun-2015. He arrived on time and gathered the information for the engineer plan. He indicated that the plan would be to me on 18-Jun-2015. When I didn't receive it by 22-Jun-2015 I contacted him and he said he was finishing it up and would send that day. I later that day received an invoice and was told that I couldn't have the sealed plan until I paid the invoice. I paid the $210 and on 23-Jun-2015 finally had an engineer plan which was shared with Kevin. 
Finally on 01-Jul-2015 I received a contract to sign. The contract included $3,358 in labor and an estimated materials of $850 (a minor increase of $100, but certainly acceptable as the first was done without the engineering plan). It is worth noting that one of the reasons I went with this highest bid was because of their scheduling estimates which were to begin work within 1-2 weeks. At this point we are at 2 weeks + 2 days.
Kevin confirmed some information and informed me that he would order materials and have them delivered to the house and that work would begin on Wednesday, 08-Jul-2015. I scheduled to be home from work that day. On Tuesday I was informed that they were running long on another job and wouldn't start until Thursday. On Wednesday I was informed that the materials couldn't be delivered until Friday, so work wouldn't begin until Monday, 13-Jul-2015. We are now beginning work 2 days shy of 4 weeks after accepting the bid, nearly double the time we were told when we chose them over the others.
On 13-Jul-2015, two sub-contractors arrived to begin work, Mike and Steve. They worked through the day and realized they needed a few more materials than were ordered. They came back and worked the next two days and we had the basic work complete. They had another job to do on Thursday, which was fine and then worked again on Friday and ordered more composite as there wasn't enough to complete. They worked again on Monday for a bit and then came back on Tuesday once additional trim was received. The composite was completed on Wednesday morning. 
At some point about half way through the work, I was informed that the materials were going to cost more than estimated. It wasn't a 20% overrun like I would expect. The materials were completely mis-estimated and instead of the $850 that was in the contract, materials were going to run over $2000. At first it was presented to me as though I misread the contract and that these costs were in there, just not spelled out as clearly as they should have been. When I stated this wasn't so and asked that I be shown where in the contract, it was acquiesced that Kevin had simply "messed up" in creating the initial estimate. He stated that this was only the second deck he had done an estimate for, which was a surprise given that during the bid process we were led to believe there was decades of experience going into this process. 
So, on 22-Jul-2015, we had a finished extension to our deck. The final bill was $5663.00, which included $2175 in materials vs. the $850 we agreed to when we signed the contract. We paid Kevin and the transaction was complete. It was another 5 days before the 'bagster' service picked up the bag on our lawn that had all the trash and scrap materials. An unfortunate note on this is that instead of putting this bag on the driveway, where there was ample space to do so, they put it on the grass. several weeks of that bag on grass ended up that my front yard now has a 5'x8' spot of "dead" in the middle of it. That was poor planning on the part of whomever decided that would be where that bag was placed (picture of the dead spot below as well).
I thing or two that I want to note on this review. I tried to give an honest account of how it went. It isn't an indictment of the people involved. Kevin was extremely nice and professional and he was apologetic for the errors in estimating the materials and the delays. Mike and Steve, the guys doing the actual work, were outstanding, professional and did a GREAT job on the deck. We couldn't be happier with the final product (pictures below).
"
Wood Rot
Tiered Deck
Basement finishing
Call The Boss
Recommended by91%of homeowners
Avatar for Shaine Unlimited
Shaine Unlimited
5.0(
6
)

Serving Ash, NC and surrounding areas

In business since 1995

Emergency services offered

Credit card accepted

"The work performed by Shaine unlimited turned out great. Turn around from quote to install happened in days and not weeks like other contractors. Job site was kept clean and workers went out of their way to address minor items which were not a part of the original job which was a pleasant surprise. We would definitely utilize them again for future projects."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+26

Recommended by100%of homeowners
Avatar for Cuttin Up Construction
Cuttin Up Construction
5.0(
8
)

Serving Ash, NC and surrounding areas

In business since 2021

Free estimates

My name is Russell. I am the owner of Cuttin Up Construction. I specialize in installing storm doors, entry doors, and sliding doors. When you hire me, you're hiring a professional who is trained and skilled to deliver lasting value to your home. I have several years of experience in the industry and I know how to keep my customers satisfied. \n\nI am currently located on Oak Island N.C and I am insured, reliable and have a great eye for detail. We offer free estimates and would love to hear from you soon. Please call us or click for an estimate today!

Glass Door Installation
Glass Door Installation
Glass Door Installation
Glass Door Installation
Additional Photos

+89

Recommended by100%of homeowners
...
Showing 1-10 of 118
Garages questions, answered by experts

The lifespan of a hurricane garage door depends on several factors, such as the quality of the materials, how well it's maintained, and the local weather conditions. As a rule of thumb, most hurricane garage doors can last anywhere from 15 to 30 years or more with proper care. However, if you start to see visible damage, the garage door becomes noisier, or you experience difficulty operating it, it may be time for a replacement.

The difference between vinyl and rubber garage door bottom seals comes down to cost, flexibility, and climate. Vinyl is the budget-friendly option, lasting well in moderate climates and resisting wear and tear. In colder climates, it can get stiff and make installation more difficult. Alternatively, rubber offers more flexibility, even in freezing temperatures, and better sticks to uneven surfaces. Rubber is more expensive but tends to be more adaptable.

If push comes to shove, and you need to manually open your garage door, then you should be able to do so. To manually open your garage door, first, make sure that the door is in the down position. You’ll need to unlock your garage door opener’s emergency release mechanism, which is typically a red robe that you can find on the carriage. Once you’ve pulled the cord, you can manually lower the door.

If your garage door is stuck in an open position, consider contacting a professional to safely release the opener.

An insulated garage door is a great long-term investment if it’s within your budget. They save energy and give the door year-round usability. In other words, the door pays for itself after a few nasty winters. Most modern garage doors already have a fair amount of insulation, so look into those options if you don’t feel comfortable splurging.

The lifespan of garage door springs depends on the type and quality of the springs, the physical environment, and the level of use. In general, properly installed and maintained springs open and close a garage door around 10,000 times . That equates to around seven years if you open and close the door about four times a day. If you use your garage door more frequently, live in a very cold or humid environment that promotes corrosion or rust, or have a very heavy door, your springs may wear out faster and require replacing sooner.

The Ash, NC homeowners’ guide to garage services

From average costs to expert advice, get all the answers you need to get your job done.