Top-rated pole barn builders.

Get matched with top pole barn builders in Ash, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Ash, NC?

Select your specific project to find the pro for you.

TRUSTED BY ASH, NC HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon14
    Verified pole barn building services reviews

Find Pole barn builders in Ash

Avatar for DLS Home Services
DLS Home Services
5.0(
50
)
Shed, Barn or Playhouse - Repair

Serving Ash, NC and surrounding areas

In business since 2007

Free estimates

Warranties offered

"We had Dave install several grab bars in our bathrooms. He work was impeccable. Dave's workmanship is second to none. He is honest, competent, and possesses the kind of work ethic that we wish everyone had. We will be using DLS Home Services for any and all future home repair needs."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+49

Response time2 days
Recommended by97%of homeowners
Mighty Hands Roofing Inc
4.2(
461
)
Shed, Barn or Playhouse - Repair

Serving Ash, NC and surrounding areas

In business since 1986

Free estimates

Emergency services offered

"After the repair was done I noticed a leak in my bathroom ceiling where one of the roof vents were replaced. I called the Subcontractor Brian on a Saturday morning. The weather was cold and raining. He was at my house within the hour up on the roof and fixed the leak. I havent had any leaks since. I would hire Brain the Subcontractor again."
Recommended by80%of homeowners
Avatar for AMC East Coast Remodeling
AMC East Coast Remodeling
5.0(
12
)
Shed, Barn or Playhouse - Repair

Serving Ash, NC and surrounding areas

Emergency services offered

Credit card accepted

"We had our entire new 3k+ square ft home’s interior, including trim painted and it turned out fantastic! Martha, Tony and crew were exceptional. Not only was the ease of doing business, the cost of the project, and professionalism all great but the quality and meticulousness was over the top. They did so good that we kept them on to do all of the cabinets in our home. They also removed some built-in furniture and repaired the trim etc as well as fixed some ceiling damage caused by our movers. It all looks brand new. We couldn’t be happier with AMC and will definitely employ them again and recommend them for sure."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+164

Recommended by100%of homeowners
Avatar for Shaine Unlimited
Shaine Unlimited
5.0(
6
)
Shed, Barn or Playhouse - Build

Serving Ash, NC and surrounding areas

In business since 1995

Emergency services offered

Credit card accepted

"The work performed by Shaine unlimited turned out great. Turn around from quote to install happened in days and not weeks like other contractors. Job site was kept clean and workers went out of their way to address minor items which were not a part of the original job which was a pleasant surprise. We would definitely utilize them again for future projects."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+26

Recommended by100%of homeowners
Avatar for Get It Done, LLC
Get It Done, LLC
5.0(
11
)
Shed, Barn or Playhouse - Repair

Serving Ash, NC and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"I liked that CJ was thorough. He made sure to let me know what was going on, while I was on vacation and he was completing the deck for my husband as a surprise for Fathers day. He called, sent me a text messages and was great at keeping me informed. Before I left to have him do the work, I had some concerns with some steps that were build from the previous owners. They were not attached or supported very well. He did a great job at reinforcing those steps; there are no so many cross beams and support that those steps are not going anywhere and do not even move at all either. He did most of the work by himself, but had a crew out depending on the day. They came out early and stayed out working until the evening. He and his crew were great, polite and respectful to my home. He worked with me on pricing and found the best product for what we were looking for. My husband was extremely surprised and we have been using the deck ever since."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Avatar for Craftsman Direct Handyman Home Improvement
Craftsman Direct Handyman Home Improvement
4.1(
321
)
Shed, Barn or Playhouse - BuildShed, Barn or Playhouse - Repair

Serving Ash, NC and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"I contacted three different providers to give quotes on adding a 12'x16' deck extension to the existing deck. This would be about 1.5 feet off the ground and covering an existing concrete slab. Craftsman contacted me and scheduled Kevin H. to come out to perform the estimate and he did so on 08-Jun-2015. Kevin's demeanor was professional and he seemed knowledgeable and focused on providing what I wanted. We received the estimate from him 3 days later for $3300-$4000 labor and $750 materials. We were told at that time that scheduling was 1-2 weeks out. While Craftsman was the highest bid, we decided to go with them because they seemed knowledgeable and slightly more "polished" than the other potential contractors, and one of the important factors for us was that they could start work in 1-2 weeks as we were eager to get the deck finished so we could do some other projects around the deck. 
On 14-Jun-2015 we sent the email accepting the proposal and on 15-Jun-2015 Kevin confirmed receipt and stated Laura would send over the contract to sign and schedule us. He re-affirmed that we were 1-2 weeks out on the schedule. Later that day, I received a follow-up email from Kevin informing me that the engineering plan they would work from is my responsibility and provided me with the name of an engineer and told me I will pay the engineer directly. This was the first time that I was told I had to separately contract, schedule, and pay for additional services outside of the bid. I was told at this time we would hold off on the contract until the engineer came out and provided a more concrete plan so the contract could be more accurate. I was assured at that time that we would keep our place in schedule so we didn't go to the end of the line. We weren't happy with this development but moved forward. 
I contacted the engineer (which I am not sure that was needed for such a small deck project) and he agreed to come to the house and meet me on 16-Jun-2015. He arrived on time and gathered the information for the engineer plan. He indicated that the plan would be to me on 18-Jun-2015. When I didn't receive it by 22-Jun-2015 I contacted him and he said he was finishing it up and would send that day. I later that day received an invoice and was told that I couldn't have the sealed plan until I paid the invoice. I paid the $210 and on 23-Jun-2015 finally had an engineer plan which was shared with Kevin. 
Finally on 01-Jul-2015 I received a contract to sign. The contract included $3,358 in labor and an estimated materials of $850 (a minor increase of $100, but certainly acceptable as the first was done without the engineering plan). It is worth noting that one of the reasons I went with this highest bid was because of their scheduling estimates which were to begin work within 1-2 weeks. At this point we are at 2 weeks + 2 days.
Kevin confirmed some information and informed me that he would order materials and have them delivered to the house and that work would begin on Wednesday, 08-Jul-2015. I scheduled to be home from work that day. On Tuesday I was informed that they were running long on another job and wouldn't start until Thursday. On Wednesday I was informed that the materials couldn't be delivered until Friday, so work wouldn't begin until Monday, 13-Jul-2015. We are now beginning work 2 days shy of 4 weeks after accepting the bid, nearly double the time we were told when we chose them over the others.
On 13-Jul-2015, two sub-contractors arrived to begin work, Mike and Steve. They worked through the day and realized they needed a few more materials than were ordered. They came back and worked the next two days and we had the basic work complete. They had another job to do on Thursday, which was fine and then worked again on Friday and ordered more composite as there wasn't enough to complete. They worked again on Monday for a bit and then came back on Tuesday once additional trim was received. The composite was completed on Wednesday morning. 
At some point about half way through the work, I was informed that the materials were going to cost more than estimated. It wasn't a 20% overrun like I would expect. The materials were completely mis-estimated and instead of the $850 that was in the contract, materials were going to run over $2000. At first it was presented to me as though I misread the contract and that these costs were in there, just not spelled out as clearly as they should have been. When I stated this wasn't so and asked that I be shown where in the contract, it was acquiesced that Kevin had simply "messed up" in creating the initial estimate. He stated that this was only the second deck he had done an estimate for, which was a surprise given that during the bid process we were led to believe there was decades of experience going into this process. 
So, on 22-Jul-2015, we had a finished extension to our deck. The final bill was $5663.00, which included $2175 in materials vs. the $850 we agreed to when we signed the contract. We paid Kevin and the transaction was complete. It was another 5 days before the 'bagster' service picked up the bag on our lawn that had all the trash and scrap materials. An unfortunate note on this is that instead of putting this bag on the driveway, where there was ample space to do so, they put it on the grass. several weeks of that bag on grass ended up that my front yard now has a 5'x8' spot of "dead" in the middle of it. That was poor planning on the part of whomever decided that would be where that bag was placed (picture of the dead spot below as well).
I thing or two that I want to note on this review. I tried to give an honest account of how it went. It isn't an indictment of the people involved. Kevin was extremely nice and professional and he was apologetic for the errors in estimating the materials and the delays. Mike and Steve, the guys doing the actual work, were outstanding, professional and did a GREAT job on the deck. We couldn't be happier with the final product (pictures below).
"
Wood Rot
Tiered Deck
Basement finishing
Call The Boss
Recommended by91%of homeowners
Avatar for C & J Hunt Construction Services LLC
C & J Hunt Construction Services LLC
4.1(
68
)
Shed, Barn or Playhouse - BuildShed, Barn or Playhouse - Repair

Serving Ash, NC and surrounding areas

In business since 2007

Free estimates

Credit card accepted

"JOB DONE WAS EXCELLENT - THEY CLEANED UP THE AREA OF OLD CEDAR SHINGLES; INSTALLED TYVEK AND INSTALLED PVC RAKE AND REPLACED ANY CEDAR SHINGLES MISSING OR DAMAGED AROUND THE HOUSE. BRIAN AND STEVE DID AN EXCELLENT JOB OF INSTALLING THE NEW CEDAR SHINGLES AND PVC TRIM ON ONE SIDE OF THE SALT BOX HOME THAT WAS IN THE SUN AND TWO GABLE END AWNING WINDOWS. ANY ITEM THAT WAS ON THE HOME LIKE THE CENTRAL A/C LINES THAT WERE OUTSIDE THE HOME WAS PUT  BACK IN A PROFESSIONAL MANNER. THEY EVEN PUT TRIM AROUND MY UTILITY BOXES A NICE TOUCH.
WOULD HIGHLY RECOMMEND THIS CONTRACTOR! GOOD QUALITY WORK. WE FOUND THAT THE ORIGINAL BUILDER NEVER PUT ANY FLASHING ON THE CHIMNEY. THEY INSTALLED OVER 100 FEET OF LEAD FLASHING AND OVER 13 BUNDLES OF CEDAR SHINGLES. THE CONTRACTOR WAS FROM CAPE COD BUT THEY WORK ALL OVER  NEW ENGLAND. I DID HAVE TO WAIT FOR THE CONTRACTOR TO DO THE WORK BUT GOOD THINGS TAKE TIME BUT IT WAS WORTH THE WAIT.
THANK YOU CHARLIE, HOPE WE CAN HAVE YOU COME BACK AND INSTALL THAT DECK. THANK YOU FOR HAVING THE TIME TO DO THIS JOB.
"
Bloomfield Garage
Cassata Built-In
Sadler Renovation
Recommended by85%of homeowners
...
Showing 1-10 of 110
Pole Barn Builders questions, answered by experts

While it’s best to have access to large, healthy, strong trees in a safe position, treehouse living is still possible without them. Contractors can fit tree posts to build the structure onto or use posts as additional support alongside the trees themselves. If you’re in doubt about the suitability of the trees on your land, consult with a local treehouse builder before you start the project.

Tiny houses, often called tiny homes, need between 100 to 400 square feet, with the most common size being between 200 and 300 square feet. Tiny houses more than 400 square feet venture into apartment-size dwellings and may be considered more of a traditional house than a tiny home. The number of occupants, desired lifestyle, and furniture will all be major factors that determine the desired tiny house size.

A steel frame costs 10% to 20% more than a wood frame. Wood is a much easier material to work with, more accessible, and generally more affordable than steel—plus, you need specialized tools to work with steel.

Ranch and colonial-style homes are often the most affordable to build. They have a common layout with available designs that are easy to adjust in simple ways without having to spend too much on a structural engineer or architect. Both types of homes' symmetry, simple roofs, and often one or two-story plans mean they often fall in the $150 to $200 square-foot range, putting them right around average.

While prices fluctuate because of increased demand, fewer supplies, and engineering time, OSB generally remains more affordable than plywood at $1 to $2.40 per square foot compared to the $4.50 to $10 for plywood. Cost is only one factor you should consider when deciding between OSB and plywood.

The Ash, NC homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.