Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Jackson, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Jackson, MS?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Jackson

Avatar for ICM Industrial Coating Masters
ICM Industrial Coating Masters
5.0(
1
)
Concrete Floor Coating-ApplyConcrete Finishing, Overlays & Coloring - ApplyConcrete Floor Coating-Apply - For Business

Serving Jackson, MS and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

With over 10 years experience in the Epoxy industry, Restoring Touch is your industry expert in the Ellisville, MS area. We pride ourselves on our extreme professionalism and attention to detail. Our customer satisfaction guarantee will assure you we will leave your property until you are completely satisfied with our work. As a family owned and operated business you can trust that we will treat your home as we would treat our own. We have so many options to fit any budget. Give us a call today and we look forward to working with you!\n

Hands of Earth energy
Store flooring
yoga studio floors
Store flooring
Response time3 days
9 neighbors recently requested a quote
...
Showing 1-10 of 80
Epoxy Flooring questions, answered by experts

Most coatings take 1-3 days, including surface preparation and drying time.

You primarily need to be concerned about the moisture level in concrete when you are dealing with a basement or other below-ground part of your house. If you find any indication of moisture in your subterranean space, consider calling in a professional for further testing and moisture control solutions.

The best time to seal your concrete driveway is sometime in the spring and fall when the temperature is above 55 degrees Fahrenheit. Keep an eye on the weather, and be sure to pick a day without rain on the forecast for at least 24 hours. Lastly, be sure you can leave the space free of foot and car traffic for the full drying time.

Yes, professionals offer slip-resistant options for added workplace safety.

Apply two coats of paint to a garage floor after priming for optimal results. The first coat serves as a base layer, providing adhesion and coverage. Allow the first coat to dry thoroughly before applying the second coat, typically after 12 to 24 hours. The second coat ensures even coverage and durability and enhances the floor's appearance. Additionally, applying two coats helps to create a more substantial barrier against stains, chemicals, and wear and tear, resulting in a longer-lasting finish. 

The Jackson, MS homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.