Top-rated above ground pool installation pros.

Best above ground pool installation pros near Weldon Spring, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Weldon Spring, MO?

Select your specific project to find the pro for you.

TRUSTED BY WELDON SPRING, MO HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon295
    Verified above ground pool installation services reviews

Top-Rated Above ground pool installation pros in Weldon Spring - Updated Nov 2026

Avatar for Two Men And A Spa Dolly
Two Men And A Spa Dolly
4.1(
14
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Weldon Spring, MO and surrounding areas

In business since 2003

Credit card accepted

"I just had a three man crew move my hut tub today. They showed up on time, loaded everything including the cover, stairs and cover lift, and within minutes they were moving to the new house. They were very professional and friendly, and set up the hot tub exactly how I wanted it. The whole process was less than an hour, not including drive time. The pricing was exactly as quoted. I would highly recommend Two Men and a Spa Dolly."
Recommended by91%of homeowners
Avatar for Conservative Pool Services Llc.
Conservative Pool Services Llc.
5.0(
4
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Weldon Spring, MO and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"Mike and his crew are very punctual and professional. I am very comfortable sending him a text with what I need and coming home and knowing it was completed properly. My pool is salt water and over 8 years old. I have replaced the pump, salt generator, cleaner pump and filters. Each of these services were done to my satisfaction. I recently installed a water heater and it was not working on a Saturday when I was expecting guest on Sunday. Mike came by on Saturday and made sure he got it working. My two black labs swim every day and the crew come by every two weeks to maintaine the pool. It always looks great and sparkles."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
Showing 1-10 of 33
Install Above Ground Pools FAQs, answered by experts

While you can install an above ground pool on most level surfaces, you’ll need sand to protect your liner from tearing. For example, rocks, plants, and twigs can take a toll on your liner. Adding sand will help level the pool even more. For additional support, you can also use angled foam or a foam pool cove.

If a pool turns green after adding salt, there’s a good chance the salt is the problem. Certain brands of salt have high levels of iron that cause pool water to take on a green hue. Test your pool water to determine if this is the issue. The green color will usually filter out. Brush the sides of the pool to knock the iron off.

This is just one reason a pool can turn green that is specific to adding salt. Many other reasons a pool can turn green include algae growth, low chlorine levels, a faulty filter, etc.

DIY is not recommended due to its complexity. Professional installation ensures proper fitting and longevity.

The disadvantages of container pools come down to flexibility and customization. Shipping containers come in standard sizes, so the sizes and shapes are limited. They also have a very distinctive look, which may not suit the aesthetic of your backyard. 

Beyond that, while container pools are more affordable than in-ground pools, certain models can be more expensive. This includes the cost to heat your pool, since the metal walls have more heat transfer than other types of pools (which some brands circumvent with insulation).

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Weldon Spring, MO homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.