Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Frontenac, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Frontenac, MO?

Select your specific project to find the pro for you.

TRUSTED BY FRONTENAC, MO HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon231
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Frontenac

Avatar for Two Men And A Spa Dolly
Two Men And A Spa Dolly
4.1(
14
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Frontenac, MO and surrounding areas

In business since 2003

Credit card accepted

"I just had a three man crew move my hut tub today. They showed up on time, loaded everything including the cover, stairs and cover lift, and within minutes they were moving to the new house. They were very professional and friendly, and set up the hot tub exactly how I wanted it. The whole process was less than an hour, not including drive time. The pricing was exactly as quoted. I would highly recommend Two Men and a Spa Dolly."
Recommended by91%of homeowners
Avatar for Conservative Pool Services Llc.
Conservative Pool Services Llc.
5.0(
4
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Frontenac, MO and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"Mike and his crew are very punctual and professional. I am very comfortable sending him a text with what I need and coming home and knowing it was completed properly. My pool is salt water and over 8 years old. I have replaced the pump, salt generator, cleaner pump and filters. Each of these services were done to my satisfaction. I recently installed a water heater and it was not working on a Saturday when I was expecting guest on Sunday. Mike came by on Saturday and made sure he got it working. My two black labs swim every day and the crew come by every two weeks to maintaine the pool. It always looks great and sparkles."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
Showing 1-10 of 30
Install Above Ground Pools questions, answered by experts

It’s a good idea to wait at least 24 hours after opening your pool before you swim in it. Pool opening often involves shocking the water, and the chemical levels need to come down a bit before it’s safe to swim. You can continue testing your water pH and chlorine levels if you’re in a rush. It’s wise to wait until your chlorine levels drop to under four parts per million (ppm) and you have a water pH of between 7.2 and 7.8. You can artificially lower your water pH to speed up the process.

You don’t need to dilute the baking soda before adding it to your pool. While you can if you want, adding too much water into your pool can throw off your math and chemicals. Your pool’s circulation system will do most of the dissolving work for you, so it’s OK to skip the dilution.

Swim spas are like hybrid hot tubs and pools. They have the heating and jets of a hot tub, but they’re slightly longer because they’re made for swimming and exercise. A jet provides a continuous current that acts like a water treadmill. You can swim the length of a full-size pool without going anywhere.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Off-season pool-building prices often align with the time of year you're least likely to use a pool. Many contractors offer deals in the late fall and winter to bolster the slow time of year. However, if you live in an area with freezing winters, you'll need to wait beyond the final frost and threats of extreme weather.

The Frontenac, MO homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.