Top-rated paving pros.

Get matched with top paving pros in Milan, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Milan, MI?

Select your specific project to find the pro for you.

TRUSTED BY MILAN, MI HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon97
    Verified paving services reviews

Find Paving pros in Milan

Avatar for Mike's Asphalt
Mike's Asphalt
4.4(
7
)
Asphalt Paving - Repair or Patch

Serving Milan, MI and surrounding areas

Approved

In business since 2009

Free estimates

Credit card accepted

"Showed up on time including workers. W a went straight to work. Did a driveway cap and. I would hire him again it looks great If you want a great price MIKE S ASPHALT is the right choice."
100 yards of new driveway!
Racetrack Vibes.
New parking
Fresh asphalt with parking
Response time1 day
Response rate98%
3 neighbors recently requested a quote
Avatar for Topiary Landscaping
Topiary Landscaping
5.0(
5
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeInterlocking Pavers for Patios, Walks & Steps - Install

Serving Milan, MI and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

Hello Washtenaw County,\n\nBorn and raised here, after working as a landscape professional for 4 years, I decided to enter the industry as an owner operator.\n\nI have a love of nature and transforming green spaces into livable, beautiful environments. \n\nThere is no job too big or too small. I specialize in paver patios, retaining walls, Grading and storm water Drainage. \n\nBut I can also offer planning, maintenance and Installation of any planter bed or backyard transformation you may desire. Everything from classic american design to zen gardenscapes, I can help you make it a reality.\n\nPlease feel free to reach out and get to know the kind of detailed work I can provide.\n\nhttps://topiarylandscaping.com/

Dated Paver Patio
Finished Patio
Finished Patio
Paving Over
First Course

+21

4 neighbors recently requested a quote
Avatar for G Diaz construction
G Diaz construction
5.0(
1
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Milan, MI and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

we specificalize in concrete driveways walkways sidewalks patios repairs and all, we also do painting roofing and lawn work, pavers we guarantee are work and if you don?t like it we will come back no charge and replace, until customer is happy, Here at G Diaz Construction Inc we make your home a place everyone feels welcomed and warm

Concrete
Concrete
Concrete
Concrete
Concrete

+1

...
Showing 1-10 of 108
Paving Services questions, answered by experts

The ideal distance between stepping stones depends on your design preference. A general rule is to place them about 24 inches apart from center to center to match an average person's stride. Another common approach is to leave about 6 inches of space between the edges of each stone; this can be adjusted to fit the path's total length without cutting pavers. If you plan to plant between the stones, leave at least 6 to 8 inches of space to give the plants room to grow.

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

Box fill refers to the maximum number of conductors that can be contained within a wiring enclosure box, as well as the total volume of the components. Determining the allowable number of conductors in a box requires adding up the number of conductors, clamps, support fittings, devices and equipment, and equipment grounding conductors to make sure you’re within the allowable volume.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

While paving a driveway is possible to do as a DIY project, we don’t recommend it. Hiring a driveway professional to pave it will ensure that your driveway looks neat and clean and lasts for years to come, and it will also prevent a weak driveway and, potentially, damage to your foundation. Paving a driveway requires heavy machinery, and while you can rent the equipment needed, operating it close to your garage slab or around your home’s foundation can crack it and lead to structural issues. 

The Milan, MI homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.