Top-rated basement remodelers.

Get matched with top basement remodelers in Dorr, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dorr, MI?

Select your specific project to find the pro for you.

TRUSTED BY DORR, MI HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon33
    Verified basement remodels reviews

Find Basement remodelers in Dorr

Avatar for New Image Remodeling
New Image Remodeling
4.9(
128
)

Serving Dorr, MI and surrounding areas

Approved

In business since 1991

Free estimates

Warranties offered

"Mark and the team from New Image Remodeling were excellent. They provided fair, competitive pricing and did absolutely A+ work. We are so happy with our new basement and get nothing but compliments from friends and family on how great it looks. From the start, Mark and team were extremely easy to work with. They were clear and transparent with their communication and always professional & courteous. They did a great job of working within our budget and were very flexible and accommodating even when we requested changes in the scope of work. When minor issues did pop-up (as they always do), Mark & team were on top of them right away, even coming out on the weekend if necessary. I would recommend New Image Remodeling to anyone looking to finish or remodel a portion of their home and they'll be the first call I make for any future projects."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+51

Response time3 days
19 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Michigan Construction Services, LLC
Michigan Construction Services, LLC
4.7(
23
)

Serving Dorr, MI and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

"GS and Jose were incredible. They helped make sure my painting project was finished in a very fast and thorough manner while I dealt with my back injury. I was so impressed with the end result and plan to call them back in the Winter for my basement. Highly recommend Lake Michigan Painting."
Basement Remodel
Exterior Painting
New Roof
New Deck Boards
Working Late

+6

Response time1 day
Response rate87%
7 neighbors recently requested a quote
Avatar for COMMUNITY CONSTRUCTION MICHIGAN LLC
COMMUNITY CONSTRUCTION MICHIGAN LLC
4.3(
20
)

Serving Dorr, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2021

Free estimates

Credit card accepted

"Construction worker Nick showed up everyday and did an excellent job!We turned our pantry off the kitchen into a.n addit.tional habbath and turned the tub in bathrooms into a walk in shower. We are very pleased with the work done with both rooms."
Before
Modernized Roof
Long Deck After
Long Deck Before
AFTER!

+3

Response time1 day
4 neighbors recently requested a quote
Recommended by62%of homeowners
Avatar for KLB BUILDERS LLC
KLB BUILDERS LLC
5.0(
3
)

Serving Dorr, MI and surrounding areas

Approved

In business since 2018

Free estimates

Warranties offered

KLB BUILDERS LLC is committed to excellence in every aspect of our\nbusiness. We uphold a standard of integrity bound by fairness, honesty,\nand personal responsibility. Our distinction is the quality of service\nwe bring to our customers. Accurate knowledge of\nour trade combined with ability is what makes us true professionals.\nAbove all, we are watchful of our customers' interests and make their\nconcerns the basis of our business.

LANSING GREAT ROOM
3 neighbors recently requested a quote
Avatar for Matrix Basement Finishing
Matrix Basement Finishing
4.0(
65
)

Serving Dorr, MI and surrounding areas

In business since 2009

Free estimates

Warranties offered

"When we signed the Matrix contract in June 28,2018 for basement work we were told it would be done the end of October or the first of November 2018. We told them that was good because we go to Arizona the end of December 2018. When we left all that was done was rough: framing, plumbing, electrical and ceiling. In May 2019 Matrix started work again and finally June 17, 2019 the final inspection was done. If Matrix overbooked jobs, Matrix should let the customer the customer know and not leave them hanging. Being overbooked was probably why the drywall job and the soffit run to cover the ceiling beam was less than professional. We give the following grades: grade A to the project manager, the other work teams. grade C to Matrix as a company. Thank you, Jack and Bonnie Childs"
Happy Bathroom Customers
Happy Bathroom Customers
Happy Bathroom Customers
Response time2 days
Response rate86%
Recommended by92%of homeowners
Handy Dan Renovations
4.5(
36
)

Serving Dorr, MI and surrounding areas

In business since 1984

Free estimates

"I truly cannot say enough incredible things about Dan and his spouse s work, integrity, honesty, and humbleness! We are absolutely blown way by their professional work and the outcome. They did things the right way, not the cheap/easy way. They provided professional expertise and advice when needed. Our basement completely exceeded our expectations and now we have a whole list of things to hire Dan and Katie for. We cannot thank you enough!!!!! I HIGHLY recommend hiring them for any project."
Response time2 days
Recommended by93%of homeowners
Avatar for Michael Myers Home Improvement
Michael Myers Home Improvement
5.0(
3
)

Serving Dorr, MI and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"I gave Andrew some blueprints for a mud kitchen I had found on Etsy and he put it together and stained it within a day! It was the perfect birthday present for my daughter. Would hire again!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+50

Recommended by100%of homeowners
...
Showing 1-10 of 55
Basement Remodel questions, answered by experts

The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.

To determine if your basement walls are suitable for finishing, assess their structural integrity and moisture conditions. Look for any signs of damage, such as cracks, bowing, or excessive moisture. Ensure proper drainage and address any underlying issues before proceeding. 

Consult with a professional if you're uncertain about the structural stability or potential risks associated with finishing your basement walls.

Anything having to do with the structure of your home, such as raising the ceiling, is usually the most expensive part of finishing a basement. Another project component that could be a surprisingly high expense is adding an exterior entrance. 

The cost of a walkout basement can be anywhere from $5,000 to $35,000.

The Dorr, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.