Top-rated basement remodelers.

Get matched with top basement remodelers in Otsego, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Otsego, MI?

Select your specific project to find the pro for you.

Find Basement remodelers in Otsego

Avatar for WMA, LLC
WMA, LLC
4.1(
45
)
Basement - Remodel

Serving Otsego, MI and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

"Donavan and Mike were great. They totally stripped my bathroom and then installed new drywall and ceiling., painted it. New tub and shower, vanity, fan, lighting. Fixed a major plumbing issue discovered by a 3rd party. All for about the same money we were quoted for just the tub area."
Response time2 days
6 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for COMMUNITY CONSTRUCTION MICHIGAN LLC
COMMUNITY CONSTRUCTION MICHIGAN LLC
4.1(
24
)
Basement - Remodel

Serving Otsego, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2021

Free estimates

Credit card accepted

"Construction worker Nick showed up everyday and did an excellent job!We turned our pantry off the kitchen into a.n addit.tional habbath and turned the tub in bathrooms into a walk in shower. We are very pleased with the work done with both rooms."
Before
Modernized Roof
Long Deck After
Long Deck Before
AFTER!

+3

Response time1 day
Response rate95%
10 neighbors recently requested a quote
Avatar for Matrix Basement Finishing
Matrix Basement Finishing
4.0(
65
)
Basement - Remodel

Serving Otsego, MI and surrounding areas

In business since 2009

Free estimates

Warranties offered

"Matrix did an excellent job installing a bathroom in my basement. Steve was incredible in coordinating the different work that needed to be completed and there were many variables for him to juggle. My bathroom shower is probably the nicest in Southeastern Michigan (not bragging - I'd post pictures if I could). Steve's teams did an excellent job getting everything done and making it look as luxurious as possible. The only constructive feedback I have for the company is that the pricing was very steep considering that I believe many steps in the process may have been eliminated; the sales rep was not familiar with every scope of work necessary which made things confusing for Steve (the Project Foreman), and there was an additional individual whom I never corresponded with which made me wonder if there are too many folks involved to keep the pricing affordable. I paid to install the bathroom what I wanted to pay to complete the entire basement and I had to complete some of the work myself to include painting and flooring installation. Overall the quality of the work is tremendous, however, I still think there's opportunity to restructure the approach to completing projects that could drop the pricing down for the consumer. I would definitely hire the company again as they do incredible work and I couldn't be happier with my completed bathroom."
Happy Bathroom Customers
Happy Bathroom Customers
Happy Bathroom Customers
Basement 1
Basement 1

+54

Response time2 days
Response rate100%
Recommended by92%of homeowners
Showing 1-10 of 44
Basement Remodel questions, answered by experts

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

The difficulty of adding a basement to an existing house can vary depending on the house’s location, the size of the basement, and the type and condition of the existing foundation. Adding a basement is a job best handled by the pros, so you’ll need to enlist professional help for this project.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

The Otsego, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.