Top-rated basement remodelers.

Get matched with top basement remodelers in White Marsh, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in White Marsh, MD?

Select your specific project to find the pro for you.

TRUSTED BY WHITE MARSH, MD HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon91
    Verified basement remodels reviews

Find Basement remodelers in White Marsh

Avatar for JD Michael Construction Inc
JD Michael Construction Inc
4.9(
58
)

Serving White Marsh, MD and surrounding areas

Approved

In business since 1989

Free estimates

Warranties offered

"Joe and his team did an exceptional job helping us integrate multiple projects in our basement and the results were outstanding! We had to have our existing partially finished basement demolished so we could have french drains and a sump system put in, as well as a geothermal heating/cooling installation accomplished, after having an existing oil burning furnace and radiant heating system removed. The basement restoral project included plumbing and sink replacement, electrical and lighting efficiency upgrades, framing and drywall replacement, door replacements, flooring replacement, and a few decorative additions to give the space some character. The entire process: scoping, design, coordination, execution, and detailed wrap up was accomplished under a great leader and problem solver with highly credible and expert tradesman. We shopped around for multiple quotes before selecting JD Michael Construction. Any and all future projects will go through this team! We are grateful!"
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Additional Photos
Additional Photos

+13

4 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Quality 1st Basement Systems, Inc.
Quality 1st Basement Systems, Inc.
4.7(
113
)

Serving White Marsh, MD and surrounding areas

Approved

In business since 1999

Free estimates

Warranties offered

"Hired them for 3 projects I have installed this basement waterproofing solution in 2 homes. System speaks for itself. Nothing better on the market. Work was first rate. Expectations were presented prior to the project. Details on what would happen and how the project would go. Would not hesitate to use again ERV installed New basement egress. This project did not go as planned, but not at the fault of basement systems. Was originally supposed to get a BILCO door but due to unforseen issues, that was not able to happen. They ended up installing a new staircase from my basement to ground level. Work was first rate and ended up better than a bilco door. Company re landscaped and everything is as it was. All work performed was top notch and no issues on anything they have done"
Show Booth
Tough day
Found it in a crawlspace
What is it?
Found it in a crawlspace

+142

Response time1 day
Recommended by88%of homeowners
Avatar for Quality 1st Basement Systems, Inc
Quality 1st Basement Systems, Inc
4.6(
230
)

Serving White Marsh, MD and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"my whole home feels fantastic. very courteous and knowledgeable individuals. I would hire them again for all my basement waterproofing and basement remodeling needs in the future. Its hard to find a family run business with amazing values and professionalism. these guys have it all."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+129

21 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for David Rutch's Precision Remodeling Inc
David Rutch's Precision Remodeling Inc
4.8(
123
)

Serving White Marsh, MD and surrounding areas

Approved

In business since 2004

Free estimates

Warranties offered

"Best contractors I've ever had the pleasure of working with! Showed up on time, cleaned up every day and did an excellent job on the installation of my kitchen backsplash. I would 100% recommend Precision Remodeling!"
Additions
Additions
Additions
Additions
Additions

+142

10 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for Penate Home Improvement LLC
Penate Home Improvement LLC
4.9(
142
)

Serving White Marsh, MD and surrounding areas

Approved

In business since 2006

Free estimates

Warranties offered

"Penate Tile is great, I had them refurbish a basement room and build a screen porch and both projects were excellent. On time, affordable, and great craftsmanship."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+701

6 neighbors recently requested a quote
Recommended by95%of homeowners
Avatar for Dewar General Contracting
Dewar General Contracting
5.0(
20
)

Serving White Marsh, MD and surrounding areas

Approved

In business since 2008

Free estimates

Emergency services offered

"While we have not done the project the team was helpful with getting things sorted out until we are ready to pull the trigger. Mike Walsh was particularly helpful and responsive. When we do the basement we will reach out to Dewar again to actually perform the work."
131 E. North Ave - Mixed use building construction
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project

+158

Recommended by68%of homeowners
Avatar for GloRem, LLC
GloRem, LLC
5.0(
24
)

Serving White Marsh, MD and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"Glorem has done fantastic job in my basement. The basement was totally unfinished of around 1000sqft. I had around 11 estimates for the job. I had a wide range of prices. They were not the cheapest but they offered the most detailed plan and price list of everything in the project. Their price was also very reasonable. Eugen and his team are extremely organized, honest and dedicated to quality work. Eugen was on top of very details in the project was present during all inspections. I really appreciate the hard work. I had a kitchenette bathroom and living area in my basement."
basement bar
frameless glass door
basement
bar and play area
wet bar

+100

Response time1 day
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for D & H Demolition, LLC
D & H Demolition, LLC
5.0(
11
)

Serving White Marsh, MD and surrounding areas

Approved

In business since 2013

Free estimates

Emergency services offered

"I love my basement now! They removed all of the asbestos flooring, adhesive etc. and installed my new floor in 2 days. The employees were very respectful and worked efficiently. They had said 3 days but they hustled and did it in 2."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

6 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 278
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

The White Marsh, MD homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.