Top-rated subcontractors.

Get matched with top subcontractors in Whaleyville, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Whaleyville, MD?

Select your specific project to find the pro for you.

TRUSTED BY WHALEYVILLE, MD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon1.5k+
    Verified subcontracting services reviews

Find Subcontractors in Whaleyville

Avatar for M Phippin Contracting Inc.
M Phippin Contracting Inc.
5.0(
22
)
Major Home Repairs (General Contractor)

Serving Whaleyville, MD and surrounding areas

Approved

In business since 2012

Free estimates

Warranties offered

"Each job that Mike did went beyond our expectations. His attention to detail, work ethic, and dependability are some of the reasons we continue to have Mike complete projects in our home."
Decks & Porches Project
Bethany Beach Kitchen
Bethany Beach Privacy Carport
Selbyville, Del. Kitchen Remodel
Entry Door

+190

Response time1 day
Response rate100%
6 neighbors recently requested a quote
Avatar for GLR Home Improvement
GLR Home Improvement
4.8(
23
)
Major Home Repairs (General Contractor)

Serving Whaleyville, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2010

Free estimates

Emergency services offered

"Gary and his team did a great job replacing the long stairway and steps to my rooftop deck. Everything from the estimate through completion of the project was professionally handled. The end result looks great. Highly recommend them."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Response time3 days
Response rate100%
3 neighbors recently requested a quote
Avatar for All Pro Exteriors
All Pro Exteriors
4.6(
62
)
Major Home Repairs (General Contractor)

Serving Whaleyville, MD and surrounding areas

In business since 1991

Emergency services offered

"wasn't able to do the project in the time frame so we didn't use him.  He was very quick to call back and set up a meeting.  Said he would be able to do the job but then saw it and said no he couldn't.  His pricing was good but he was just a one man service with no helpers.
"
Recommended by94%of homeowners
Avatar for Mediatechcom group LLC
Mediatechcom group LLC
5.0(
5
)
Major Home Repairs (General Contractor)

Serving Whaleyville, MD and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"Dennis and his coworker arrived on time and took their time to ensure that our project was done in a superior manner! I appreciated their thorough and efficient work! I plan to include them on my preferred electrician list!"
Painting of the bedroom
50" TV mounting in bed room
Networking and programming
Smart Lock 🔒 Front Door
Camera install 🎥

+71

Recommended by100%of homeowners
...
Showing 1-10 of 59
Subcontractors questions, answered by experts

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

You likely need to hire an architect for your new house design and build, unless you have the design skills and experience with building regulations and standards needed to get your plans approved. If you are able to meet the design requirements, you can hire a draftsperson to create the blueprints for the builders to follow.

Universal design costs can be minimal when you add them during construction; however, adding universal design principles to existing homes can sometimes increase renovation costs. For example, a mid-grade bathroom remodel is estimated to cost around $30,000, while a standard universal design remodel can cost closer to $40,000. Adding accessible design components can include widening hallways ($500 to $2,000), curbless showers ($2,000 to $8,000), and widening doors ($400 to $800). Keep in mind that these increased costs can lead to higher resale values because universal homes may appeal to a wider variety of buyers.

Services include creating technical drawings, floor plans, and 3D renderings for construction or renovation projects.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Whaleyville, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.