Top-rated excavation pros.

Get matched with top excavation pros in Sharptown, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Sharptown, MD?

Select your specific project to find the pro for you.

TRUSTED BY SHARPTOWN, MD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon11
    Verified excavation services reviews

Find Excavation pros in Sharptown

L. Serman Excavating
5.0(
1
)
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Sharptown, MD and surrounding areas

Approved

In business since 2015

Free estimates

Customers say: Quick response

"He did lots of work with fair pricing. They did a very clean job and was always on time. He finished sooner than originally estimated. I'm very satisfied and they did a great job, and I would use them again"
Response time6 days
Recommended by100%of homeowners
Avatar for Barnes Sitework
Barnes Sitework
New to Angi
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Sharptown, MD and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

We're a locally owned and operated company that values honesty and integrity and treats your home business as if it were our own. We offer a wide range of excavation,grading,demolition,land clearing and hauling services We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guarantee your satisfaction! \n\nCheck and cash

Response time1 day
Avatar for Stable Works LLC
Stable Works LLC
4.8(
10
)
Excavation - Major Grading or Resloping - For Business

Serving Sharptown, MD and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"I have had serveral remolding project. Being a single female I never felt comfortable and sometimes they took shortcuts. The Stableworks crew was extremely professional and explained each part of the process. I recommend this company highly."
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel

+8

Response time6 days
Recommended by77%of homeowners
Showing 1-10 of 29
Excavating questions, answered by experts

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The best way to protect tree roots is to avoid the roots entirely by excavating outside the root radius of the tree. For nearby projects, it’s a good idea to construct a temporary retaining wall. But that’s not always possible, depending on the project and the root system. In these cases, consider using alternative equipment like an auger to tunnel under the ground.

Remember, tree roots can damage nearby cement foundations as they grow. If a tree is close enough to interfere with large excavations, it may be better to remove the tree than risk future problems.

The average cost of excavation is approximately $3,200, with typical projects ranging from $500 to $15,000. Depending on the contractor, you may be charged between $50 and $200 per cubic yard or an hourly rate of $40 to $180 for an excavation specialist. The total cost is influenced by several factors, including the project size, the amount of soil to be removed, and the soil's condition. Hard soil, tree roots, or excessive rocks and clay can increase the price, potentially adding $200 to $1,200 to the final bill. Other factors that can drive up costs include the presence of nearby structures that complicate the work or tight spaces that require manual excavation instead of heavy machinery.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

The Sharptown, MD homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.