Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Laurel, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Laurel, MD?

Select your specific project to find the pro for you.

TRUSTED BY LAUREL, MD HOMEOWNERS

  • Average homeowner rating star icon3.6
    Average homeowner rating
  • Verified reviews icon65
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Laurel

Avatar for GPRO Landscaping LLC
GPRO Landscaping LLC
4.9(
63
)

Serving Laurel, MD and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"Great work and service by Eric, Ricardo and the crew. They went above and beyond with fixing the fireplace stone, power washing the patio, installing our grill, running the gas line from the house to the grill, and reporting the patio and stone wall. Highly recommend their service."
Landscaping - Hardscaping & Pavers Project
Patios Project
Patios Project
Landscaping Project
Decks & Porches Project

+74

Recommended by100%of homeowners
Avatar for BJ Pool & Spa
BJ Pool & Spa
4.2(
42
)

Serving Laurel, MD and surrounding areas

In business since 1983

Credit card accepted

"

My pool needed pretty much a rework of all the filtering and pump equipment due to age.

Contacted several companies for quotes.  BJ's was in the middle ground pricewise, but 2 of the companies were also sky high on their estimates.

These guys removed all the old equipment, put in a new concrete pad, & installed all new equipment.

They started on schedule and finished when they said they would.

Bill from BJ's did a great job and is very professional as is everyone else there at BJs.

Bob (the owner of BJs) even found me a replacement for my outdated fiber optic light which had not worked in years and had been discontinued by the manufacturers for years as well. Talk about finding a needle in a haystack!

Thanks to all at BJs for the great job!



"
Recommended by84%of homeowners
Avatar for VIP POOLS
VIP POOLS
4.3(
18
)

Serving Laurel, MD and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"Paul is the heart, soul, and brains of his company. He truly cares and treats our pool like his own. He has gone above and beyond, numerous times. There is no one else I trust. Thank you, Paul and VIP Crew!"
Pool Management
Swimming pool equipment supply and repair
Pool service and water treatment
Recommended by100%of homeowners
Showing 1-10 of 39
Install Above Ground Pools questions, answered by experts

No, you shouldn’t be able to taste the salt at all since saltwater pools only contain about 10% of the salt you’d find in ocean water. Saltwater pools do create some chlorine, though, so you should still try not to drink the water.

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

You should avoid filling your pool overnight—just as a precaution. You’ll want someone around to check on the progress. If your hose springs a leak or you overfill your pool, you could end up with some costly water damage. At worst, you could flood your home’s foundation. For this reason, ensure someone is home and awake, even if your pool takes a couple of days to fill.

There are some companies that offer acid washes that do not require pool draining. However, the process can take several days and requires a bit more elbow grease to scrub the pool surface compared to draining it entirely. Since your pool surface and age are both a factor, work with a professional to choose the best method.

The amount of time your fiberglass pool project will take depends on the size of the pool and whether you are installing add-ons like decking and landscaping. Overall, you should expect it to take four to six weeks to install. If you are dreaming of summer pool parties, make sure to budget enough time into the installation schedule to have your pool up and running in time for the swimming season.

The Laurel, MD homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.