Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Colesville, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Colesville, MD?

Select your specific project to find the pro for you.

TRUSTED BY COLESVILLE, MD HOMEOWNERS

  • Average homeowner rating star icon3.7
    Average homeowner rating
  • Verified reviews icon79
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Colesville

Backyard Ponds LLC
4.4(
49
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Colesville, MD and surrounding areas

In business since 1996

Free estimates

Credit card accepted

"They did a pretty thorough job. We've been pleased with them so far. Everybody has been very nice. They've pretty much been reliable. When they say they're going to come, they come. They get back to you. It's a good recommendation. They showed up on time, cleaned up after themselves and seemed to work pretty steadily. They were friendly. We didn't have any problems. They did what they were supposed to do and their prices were reasonable for what we thought they did. They said it would take about a day and they did it in about a day. They were upfront. There's not that many companies that do what they do, so we didn't do a lot of comparison shopping, but we thought the price was fair. I've been using them for maintenance work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+13

Recommended by93%of homeowners
Avatar for Subcomm Pools
Subcomm Pools
5.0(
9
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Colesville, MD and surrounding areas

In business since 2006

Free estimates

Credit card accepted

"

Hristo did everything possible to get the job done. This particular June 2016 was filled with many rain days and made his schedule hectic. He kept me in the loop and was up front and honest about the delay noting vinyl liners must be installed in dry, sunny weather - none of which came for a few weeks.

The job was handled quickly and professionally while his team made several visits to complete the job. During this time we got even more rain but the liner was installed by then and they finished all well within the timeframe.

I write all this because Hristo kept me informed which I appreciated and which has earned him and his team my respect and gratitude.

A job more than well done! Also, within budget :)


Frank McGuire

Gaithersburg, MD

"
Pool renovation
Pool renovation
Pool renovation
Additional Photos
Additional Photos

+5

Recommended by100%of homeowners
Showing 1-10 of 40
Install Above Ground Pools questions, answered by experts

Pool concrete or gunite can take several weeks to cure, or an average of 30 days, before workers can resume construction. Additional work and finishes push the time to build a pool out of concrete to between three and six months. There are many types of pools that take far less time, so keep these in mind if you're on a short timeline.

Shipping container pools last up to 25 years. On average, they’re more durable than the standard aboveground pool, which only lasts 10 to 20 years. Their durability is similar to fiberglass in-ground pools. Concrete pools, on the other hand, outlive almost any other type of pool. They can last indefinitely as long as you resurface them as needed.  

If you don’t bond a pool, you risk electric shock for those walking around or swimming. Bonding creates safe pathways between the electricity needed to run the pool and metallic parts also necessary for the proper function of the pool. Once the pool is bonded, it’s ready for grounding, the second step in creating an electrically safe pool.

It’s a good idea to wait at least 24 hours after opening your pool before you swim in it. Pool opening often involves shocking the water, and the chemical levels need to come down a bit before it’s safe to swim. You can continue testing your water pH and chlorine levels if you’re in a rush. It’s wise to wait until your chlorine levels drop to under four parts per million (ppm) and you have a water pH of between 7.2 and 7.8. You can artificially lower your water pH to speed up the process.

The number of gallons in your pool will determine how much chlorine you’ll need to add to your pool for the first time. Chlorine levels should fall between 1 and 3 ppm. It's crucial to read the instructions on your chlorine packet to determine the number of tablets to put in the water based on your pool's capacity.

The Colesville, MD homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.