Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Berlin, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Berlin, MD?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Berlin

Avatar for Capital Paving Construction
Capital Paving Construction
4.4(
58
)

Serving Berlin, MD and surrounding areas

In business since 1960

Free estimates

Emergency services offered

"Absolutly stellar performance by Capital Paving and Construction. They are incredibly responsive, professional, and committed to delivering a quality product for a reasonable price. I would highly recommend their services - they will be the go to paving contractor for me in the future."
Additional Photos
Recommended by94%of homeowners
Showing 1-10 of 42
Epoxy Flooring questions, answered by experts

No. You cannot use asphalt products on concrete driveways. To seal a concrete driveway, use acrylic, epoxy, polyurethane, silane, siloxane, and silicate sealers or deep penetration sealers made specifically for concrete. Meanwhile, asphalt sealers contain refined coal tar (asphalt emulsion), water, sand, clay, polymers, and additives and are incompatible with concrete’s surface texture and higher density.

Concrete is the most popular garage flooring option because it’s durable and can stand up to the weight of vehicles. If you plan on using your garage to park your car or store heavy items, concrete is a solid option. However, if you want to convert your garage to a living space, you can choose any number of flooring options to go over the concrete foundation, including wood, tile, and even carpeting.

Apply two coats of paint to a garage floor after priming for optimal results. The first coat serves as a base layer, providing adhesion and coverage. Allow the first coat to dry thoroughly before applying the second coat, typically after 12 to 24 hours. The second coat ensures even coverage and durability and enhances the floor's appearance. Additionally, applying two coats helps to create a more substantial barrier against stains, chemicals, and wear and tear, resulting in a longer-lasting finish. 

Self-leveling compound usually requires up to 24 hours to dry before you can begin installing tile. It’s best to follow the instructions on the self-leveling product label for appropriate dry time. If you’re still not sure, play it safe and give the self-leveling compound two days to dry before you begin the tiling process.

You can seal a concrete slab by cleaning the surface, filling in any cracks, etching the surface, applying a sealer, and letting it dry. Concrete slabs don't typically need sealing, but you can use a topical concrete sealer if you notice signs of water damage. If you haven't already fixed the cause of the leak, then you'll want to repair the plumbing before you seal a concrete slab.

The Berlin, MD homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.