Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Jamestown, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Jamestown, KY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Jamestown

Avatar for Phillips Waterproofing
Phillips Waterproofing
3.8(
17
)
Concrete Driveways - Install

Serving Jamestown, KY and surrounding areas

Approved

In business since 2012

Free estimates

Emergency services offered

"The service was good. They have a lot of services, you name it and they have it. I would use them again. In fact, we were going to have another project and would contact them to do the foundation."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+31

24 neighbors recently requested a quote
Recommended by84%of homeowners
American Wiring Alarms
4.3(
6
)
Gate for Driveway or Security - Install or Replace

Serving Jamestown, KY and surrounding areas

Approved

In business since 1991

Free estimates

Credit card accepted

"Jon called within minutes to set up an appointment for the next morning at 9 am. He arrived on time and was able to diagnosis the problem with my central vac within a few minutes. He checked everything thoroughly and found another outlet, I didn't know even existed. I was very pleased with his promptness, knowledge and professionalism. He also charged me a very fair price. I would definitely recommend this company for any of their services and plan on using them again, if needed."
Response time2 hrs
Recommended by80%of homeowners
Andrew Gortmaker
New to Angi
Concrete Driveways - InstallGate for Driveway or Security - Install or Replace

Serving Jamestown, KY and surrounding areas

Approved

Transform your property with reliable, high-quality craftsmanship. Servicing Hardin and surrounding counties, we specialize in durable outdoor builds and precise interior renovations, delivering professional results that enhance your home's value and curb appeal with free estimates on every project.\n\nOur Core Services\n\nCustom Wood & Vinyl Fences — Secure your perimeter with beautiful, long-lasting privacy and boundary fencing.Custom \n\nDecks — Build your dream outdoor living space for entertaining and relaxation.\n\nSmall Concrete Work — Install durable patios, walkways, pads, and concrete repairs.\n\nBasement Framing — Prep your lower level with precise structural framing for custom finishes.\n\nProfessional Pressure Washing — Restore your siding, driveways, and decks to a like-new finish.

1 neighbors recently requested a quote
Avatar for MJK Seal Coating and Maintenance, LLC
MJK Seal Coating and Maintenance, LLC
4.6(
26
)
Asphalt Sealing

Serving Jamestown, KY and surrounding areas

In business since 2015

Free estimates

Small jobs welcome

"William gives good personal service. Goes out of his way to serve the customer. On time and good quality work. I'll call him again in two years when my driveway is ready for another coat."
Response time12 hrs
Response rate95%
Recommended by86%of homeowners
...
Showing 1-10 of 66
Asphalt Driveways questions, answered by experts

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

Asphalt paving offers several benefits, including cost-effectiveness and a quick installation process. It provides a durable and smooth surface, making it ideal for high-traffic areas. With proper maintenance, asphalt also offers longevity.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

The Jamestown, KY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.