Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Weiser, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Weiser, ID?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Weiser

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)

Serving Weiser, ID and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

The disadvantages of container pools come down to flexibility and customization. Shipping containers come in standard sizes, so the sizes and shapes are limited. They also have a very distinctive look, which may not suit the aesthetic of your backyard. 

Beyond that, while container pools are more affordable than in-ground pools, certain models can be more expensive. This includes the cost to heat your pool, since the metal walls have more heat transfer than other types of pools (which some brands circumvent with insulation).

You don’t need to dilute the baking soda before adding it to your pool. While you can if you want, adding too much water into your pool can throw off your math and chemicals. Your pool’s circulation system will do most of the dissolving work for you, so it’s OK to skip the dilution.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Sometimes, homeowners choose to install their pool on concrete, foam tiles, or patio pavers. Leveled dirt is also fine, as long as it’s not sod or grass. Regardless, you’ll need to install sand as a buffer to prevent your liner from tearing. Some pool installers also use a protective foam pool pad.

DIY is possible for minor repairs like patching liners. Professional services handle structural and mechanical issues.

The Weiser, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.