Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Potlatch, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Potlatch, ID?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Potlatch

Avatar for Lamar General Contracting
Lamar General Contracting
5.0(
1
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Potlatch, ID and surrounding areas

In business since 2021

Free estimates

Emergency services offered

I have been in the construction field all my adult life and love making people's dreams come true. As a locally owned and operated business we feel invested in our clients and constantly strive for customer satisfaction. We won't leave until the job is done right! Call or click to schedule an estimate today

old sidding
formed footings
new metal sidding
finished footings
Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

You don’t need to dilute the baking soda before adding it to your pool. While you can if you want, adding too much water into your pool can throw off your math and chemicals. Your pool’s circulation system will do most of the dissolving work for you, so it’s OK to skip the dilution.

The generator in your saltwater pool conversion kit transforms sodium chloride—the same salt as table salt—into chlorine. A process called electrolysis sends electricity through the water to interact with the chlorine ion. This ultimately creates the chlorine that keeps your pool safe and clean. The cell in your saltwater chlorine generator is the part that converts the salt into chlorine.

No, shock and chlorine are not the same thing, though they are related and both are used for pool maintenance. Regular chlorine, often in the form of tablets, is a sanitizer used for routine, day-to-day maintenance to keep a steady chlorine level. Pool shock, however, is a highly concentrated dose of chlorine used periodically for a more intense cleaning. It rapidly raises chlorine levels to fix issues like cloudy water or algae growth and also eliminates chloramines, which are byproducts of regular chlorination. Because their purposes and concentrations differ, they are not interchangeable, and proper pool care typically requires using both.

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

Don’t worry if your pool is still cloudy right after shocking it. Some shocking products will leave your pool cloudy for a day or so after using them. However, if your pool is still cloudy several days after shocking it, it could be due to poor filtration, low chlorine, or one of the other problems outlined above. If you’ve tried our fixes but still can’t clear the cloudiness, call a pool repair professional.

The Potlatch, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.