Top-rated above ground pool installation pros.

Best above ground pool installation pros near Cheney, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Cheney, WA?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Cheney - Updated Nov 2026

Avatar for Everlast Contracting LLC
Everlast Contracting LLC
5.0(
4
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Cheney, WA and surrounding areas

"I hired Everlast to put up my new ceiling fan, and the entire process couldn’t have been easier. The owner himself, David, came out to ensure things went smoothly, and they did a fantastic job installing it. Shortly after, I hired them again to replace my mother’s light fixtures. I highly recommend Everlast to anyone in need of quality, simple, and convenient installation services!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by100%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Cheney, WA and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for D.A.C. Construction
D.A.C. Construction
4.0(
9
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Cheney, WA and surrounding areas

Free estimates

Credit card accepted

From Concept To Creation, we want to be the ones to bring your project to life! From concrete, remodels, framing, to custom design and build, we have a knowledgeable team in all facets of building and construction. We strive for perfection in every project small or large. Quality workmanship and on time completion is a guarantee with us. We take pride in our work at DAC Construction and use the most up to date methods and tools to ensure your investment is one that lasts. Thank you for reading this and we look forward to earning your business!

Driveways - Concrete Project
Driveways - Concrete Project
Driveways - Concrete Project
Additional Photos
Additional Photos

+16

Recommended by87%of homeowners
Install Above Ground Pools FAQs, answered by experts

It’s a good idea to call in a pro to fill in your pool, because there are many potential hazards to doing it yourself. Unless you’re careful, you can damage your septic tank, plumbing pipes, and sprinkler lines. It’s also possible to damage your sewer connections, utility lines, driveway, landscaping, and sidewalk.

While some water loss from splashing and evaporation is normal, a rapid or excessive drop in the water level may indicate a leak. Other signs of a pool leak include unexplained soft or wet spots in the yard, cracks in the pool structure or falling tiles, higher-than-normal water bills, persistent algae growth or water discoloration, and standing water around the pump, pipes, or other pool equipment.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Once you use a pH decreaser, you can expect the pH to adjust in two to four hours. If you use a strong chemical like muriatic acid, it could take as little as an hour. Either way, it’s best to wait for a full turnover cycle before retesting. You want to make sure the chemical is completely dissolved and evenly distributed or you won’t have a stable pH level.

Permits are generally required to build an in-ground swimming pool. These permits cover aspects like zoning, safety fencing, and electrical work. Obtaining the correct permits involves coordination with local building authorities.

The Cheney, WA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.