Top-rated subcontractors.

Get matched with top subcontractors in Hagan, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Hagan, GA?

Select your specific project to find the pro for you.

TRUSTED BY HAGAN, GA HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon38
    Verified subcontracting services reviews

Find Subcontractors in Hagan

Avatar for Gonzalez Painting
Gonzalez Painting
4.6(
27
)
Major Home Repairs (General Contractor)

Serving Hagan, GA and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"4/15. On Mar 3. They showed up on time. It rain the next day. However, they mad it up in time. It was only two people and they painted and repaired my whole house in four days. The representative who set this up came out, gave me a very good price and was very professional. They didn't take any money until the job was finished and we did a final walk thru. I will definitely recommend them to anybody and will use this company again. I'm very impressed!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by88%of homeowners
Avatar for Backyard Custom Construction LLC
Backyard Custom Construction LLC
4.4(
15
)
Major Home Repairs (General Contractor)

Serving Hagan, GA and surrounding areas

In business since 2007

Emergency services offered

Credit card accepted

"This was our second project built by Backyard Construction. We had been so pleased with a 10x12' garden shed they built for us in 2012 that we had them build our art studio as well.  Once again, they did an outstanding job. We could not be more pleased with both buildings. Their part of the studio project involved constructing the shell of the structure; my husband and I, our electrician and our painter then finished the interior
We've used Backyard Construction because the quality of their buildings is excellent. After looking at dozens of other companies' offerings it was easy to see that Backyard used better materials and offered a higher level of workmanship yet was still very competitive pricewise. The studio is now one year old and the garden shed is two years old, and neither building has presented any problems whatsoever.
Construction began on time and was completed right on schedule. Their crew was courteous and extremely efficient. Dustin was a pleasure to work with. He was very responsive to our ideas and did an excellent job following up to make sure we were happy with everything. Working with Backyard Construction was a very positive experience for us each time, and we're more than happy to recommend them to others.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by80%of homeowners
Avatar for Evan's Cabinets Finisher
Evan's Cabinets Finisher
4.4(
9
)
Major Home Repairs (General Contractor)

Serving Hagan, GA and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"They did a great job, performed work quickly and professionally, and would definitely hire them again. Have added them to my contact list so i can call when i have the need. I would recommend them to anyone. You won't be disappointed!!!"
Before/After Countertop Project
Countertop
Before
Before
Laminate Flooring

+131

Recommended by87%of homeowners
Showing 1-10 of 34
Subcontractors questions, answered by experts

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

Italianate architecture is a reinterpretation of Renaissance styles, combining elements of Italian farmhouses and villas with Victorian materials and construction. This home style emerged in the Victorian era, gaining popularity in the U.S. in the mid-to late-1800s. The style came about in response to what many then viewed as the too-rigid and stuffy Classical style designs. 

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

A split-level home is one that has several staggered floors connected by short staircases, while a split floor plan separates the primary bedroom from the rest of the bedrooms. Split floor plans are most often found in single-story homes, while split-level homes are always at least two stories.

No, space planning is not only relevant for new spaces. With the help of a professional architect, you can still create a space plan for an existing space.

The Hagan, GA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.