Top-rated cabinet contractors.

Get matched with top cabinet contractors in Webster, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your cabinet contracting project in Webster, FL?

Select your specific project to find the pro for you.

TRUSTED BY WEBSTER, FL HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon27
    Verified cabinet contracting reviews

Find Cabinet contractors in Webster

Avatar for TPA Hardwood Flooring Systems, LLC
TPA Hardwood Flooring Systems, LLC
4.6(
112
)
Cabinets - Install

Serving Webster, FL and surrounding areas

Approved

In business since 2001

Free estimates

Warranties offered

"I have been renovating my house for about a year. I have been very frustrated with other trades I hired, not showing up for work and blaming the virus for their mis management. Edwin Rios was recommended by a neighbor, he and his company turned out to be the best contractor of all. Fast, quick and easy to work with. The house is 100 years old, the repair work on the floors and the finish made them look like brand new wood. GREAT JOB!"
Response time7 hrs
Response rate88%
14 neighbors recently requested a quote
Avatar for Morgan Kitchens of Tampa
Morgan Kitchens of Tampa
3.6(
111
)
Cabinets - Reface

Serving Webster, FL and surrounding areas

Approved

In business since 1995

Free estimates

Warranties offered

"Phil Pav did an exceptional job of explaining the refacing project, presenting the products, helping us choose the options, and offering the best price. I highly recommend both him and his company for your refacing project and look forward to our new kitchen cabinets."
Cabinet Refacing
Cabinet Refacing
Cabinet Refacing
Cabinet Refacing
New Cabinets

+8

162 neighbors recently requested a quote
Recommended by72%of homeowners
Avatar for Dedicated Service Solution Incorporated
Dedicated Service Solution Incorporated
5.0(
3
)
Cabinets - InstallCabinets - RefaceCabinets - Refinish+2 more

Serving Webster, FL and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

Dedicated Service Solutions is a locally owned and operated handyman and home improvement company proudly serving homeowners throughout West Central Florida. With more than 10 years of experience, we provide dependable service, quality workmanship, and professional results for projects large and small. Our services include hurricane shutter installation and removal, gutter cleaning, trim carpentry, pressure washing, door and window repairs, painting, drywall repair, fixture installation, furniture and appliance assembly, flooring, and general home repairs and maintenance. We believe in showing up when promised, communicating clearly, respecting your property, and getting the job done right. We proudly serve Hillsborough, Pasco, Hernando, Marion, Polk, Sumter, and Citrus Counties. No job is too small. Contact Dedicated Service Solutions today for a free estimate and experience dependable, professional service you can count on.

Dedicated Service
Dedicated Service
Dedicated Service
Dedicated Service
Dedicated Service

+6

...
Showing 1-10 of 209
Cabinet Contractors questions, answered by experts

Contractors commonly install floors before cabinets during a kitchen remodel. It’s the standard option when installing hardwood, vinyl, and tile flooring. Installing flooring first helps prevent height misalignment, ensures a seamless appearance, and saves extra flooring work and costs if you plan to replace or remove any cabinets later.

Solid wood is the most common material for cabinet bases. It’s a popular choice because it’s durable and will hold up over time. Oak, maple, cherry, hickory, and pine are all types of solid wood that can be used to build cabinet bases. Other options include plywood, medium-density fiberboard, and other types of manufactured lumber, but they need to be sealed properly to avoid swelling, separating, and delamination from moisture.

Yes, you can replace the cabinet hardware after installation to change up the look of your cabinets. Replacing the hinges, handles, pulls, and knobs allows you the design flexibility to match your other appliances or finish schemes to your liking. Talk with your kitchen designer or cabinet installer about the best hardware option for your cabinets.

Most assemblies take 1-3 hours, but larger units or those requiring wall mounting may take longer.

Installing cabinet toe kicks after installing flooring is common, as this produces a sleek, streamlined appearance along the cabinetry bases. The toe kick is a cabinetry term for the covered, recessed areas at the cabinet’s base that let you stand closer to the counter more comfortably by making room for your toes.

The Webster, FL homeowners’ guide to cabinet contracting

From average costs to expert advice, get all the answers you need to get your job done.