Top-rated cabinet contractors.

Get matched with top cabinet contractors in Dover, DE

Enter your zip and get matched with up to 5 pros

Need a pro for your cabinet contracting project in Dover, DE?

Select your specific project to find the pro for you.

TRUSTED BY DOVER, DE HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon11
    Verified cabinet contracting reviews

Find Cabinet contractors in Dover

Avatar for Revelare Kitchens
Revelare Kitchens
3.9(
132
)
Cabinets - RefinishPre-Made Cabinets - InstallCabinets - Reface

Serving Dover, DE and surrounding areas

Approved (Corporate)

In business since 2009

Free estimates

Warranties offered

"We are extremely pleased with the entire experience. The salesman was professional and very knowledgable. The contractor (Dave) worked alone and completely transformed our kitchen in a few days. Amazing! We totally recommend this company for cabinet refacing."
2
3
Elegant Cherry Kitchen
Two Tone Modern Kitchen
Two Tone Modern Kitchen

+11

Response time4 hrs
386 neighbors recently requested a quote
Recommended by61%of homeowners
Avatar for Epic Builder LLC
Epic Builder LLC
5.0(
9
)
Cabinets - Refinish

Serving Dover, DE and surrounding areas

Approved

In business since 1995

Free estimates

"Very professional and knowledgeable They are reliable trustworthy and friendly I can’t say enough good about them. I was Very satisfied with the prompt and quality work they did for me. Definitely would call them again"
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel

+18

Response time2 days
Response rate100%
2 neighbors recently requested a quote
Avatar for The Home Depot - Cabinet Makeover
The Home Depot - Cabinet Makeover
3.2(
183
)
Cabinets - InstallCabinets - RefaceCabinets - Refinish+1 more

Serving Dover, DE and surrounding areas

Approved

In business since 2003

Free estimates

Small jobs welcome

"Changed our 1960 kitchen and made it look like a kitchen built in 2020. It really exceeded our expectations. We refaced our kitchen in order to sell our house next year. We will have no problem selling this house. We were home the entire time our installer worked on the kitchen. The guy worked hard and he did a great job. I consider myself handy, but I wouldn't taken this project on. Glad we didn't decide to paint. Everyone that sees our kitchen loves it, For reasons I can't explain, they think the kitchen is larger. That is okay with us. If you are okay with your kitchen's layout and the cabinet frames are okay, then this is the way to go."
Before and After Pictures
Before and After Pictures
Before and After Pictures
Before and After Pictures
Before and After Pictures

+2

Recommended by81%of homeowners
Taylor Woodworks
New to Angi
Custom Cabinets - Build

Serving Dover, DE and surrounding areas

Approved

In business since 1995

Free estimates

We are a locally owned and operated company that values honesty and integrity in all aspects of our business. Our dedicated team of professionals have over 10 years of hands on experience, to provide innovative ideas and suggestions tailored to your projects. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today!

Response time1 hour
1 neighbors recently requested a quote
...
Showing 1-10 of 101
Cabinet Contractors questions, answered by experts

You can stack upper kitchen cabinets, but they may not fit neatly. Because upper kitchen cabinets are typically available in these standard sizes—12, 15, 18, 24, 30, 36, and 42 inches—you can stack various-sized upper cabinets. But, depending on your ceiling height, these standard sizes may not work together. That’s why smaller stacked cabinets are a much more stylish and economical choice.

Most installations take 1-3 days, depending on customization and venting setup.

Clean with a damp cloth and mild detergent. Avoid harsh chemicals and keep cabinets dry to prevent damage.

Most assemblies take 1-3 hours, but larger units or those requiring wall mounting may take longer.

Contractors commonly install floors before cabinets during a kitchen remodel. It’s the standard option when installing hardwood, vinyl, and tile flooring. Installing flooring first helps prevent height misalignment, ensures a seamless appearance, and saves extra flooring work and costs if you plan to replace or remove any cabinets later.

The Dover, DE homeowners’ guide to cabinet contracting

From average costs to expert advice, get all the answers you need to get your job done.