Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Morgan Hill, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Morgan Hill, CA?

Select your specific project to find the pro for you.

TRUSTED BY MORGAN HILL, CA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon458
    Verified backsplash installation services reviews

Find Backsplash installation pros in Morgan Hill

Avatar for Monteiro Tile, Inc.
Monteiro Tile, Inc.
4.9(
23
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Morgan Hill, CA and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"The porcelain tile installation turned out better than we hoped. Their workers adapted to the change that proved necessary (we tried to remove the previous tile and cement board underlayment ourselves). They also disposed of the tile we removed. The new floor is a joy to behold."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+184

Recommended by95%of homeowners
Avatar for Brother & Brother Builders
Brother & Brother Builders
4.8(
33
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Morgan Hill, CA and surrounding areas

In business since 2006

Free estimates

Credit card accepted

"Brother and Brother Builders is an unusually fine firm and deserves consideration for anyone contemplating remodeling. After interviewing many competitors, we selected Brother and Brother for our extensive and full makeover that included room additions, building a 700 SF covered deck, the removal of a fireplace and opening of the entire house. None of the existing rooms was untouched. In every stage of the work, Ray was an incredible project manager, from many versions of the planning, to explaining what to expect, to selecting materials, to obtaining permits, and even moving belongings, he was instrumental and greatly eased a very difficult process. He was a fine communicator and we were rarely surprised. Ray employs a small number of work groups with whom he’s been associated for many years. Together, they routinely brought projects to completion on time, or even early. The skill of his craftsmen ranges to drafting, demolition, framing, plumbing, electrical, tiling, cabinetry, flooring, roofing, installation of appliances, and much more. Ray designed a plan that even allowed our family to reside in the house during construction by sectioning off parts of it in succession; i.e.—living in the back of the house while the kitchen/living area was transformed and moving to the front while the new bedrooms/bathroom were being built. Ray even assisted in obtaining other contractors’ services, such as HVAC and installation of a full solar energy system. The end product is a high quality, essentially new house that could not be had by purchasing new construction. Since we’ve had the original house for more than 20 years, it also compares very favorably with new construction from the standpoint of property taxes, even though the quality is much higher. I rarely bother to write reviews, but five stars all around to Brother and Brother Builders!"
The Goodwin Project
The Ocean View Project
The Cherry Wood Project
Full Kitchen Remodel
Bathroom Remodel

+1159

Recommended by96%of homeowners
...
Showing 1-10 of 153
Backsplash Installation questions, answered by experts

The difference between floor and wall tiles is that floor tiles generally have higher strength and porosity ratings than wall tiles. Wall tiles are typically weaker and more likely to crack or become damaged under sustained pressure like high foot traffic. 

For this reason, avoid using wall tiles on floors and vice versa.

No, you don’t technically need a cement backer board for a wall tiling project, but not using it risks disastrous moisture damage. Cement is naturally water-resistant, whereas drywall soaks it in, which can lead to warping or mold growth. Always use a backer board treated with a waterproof membrane for bathrooms and other chronically damp areas to ensure complete tile shower waterproofing.

Tile floor installation usually takes about 16 hours of active work along with a couple of days of drying time between tile and grout applications.

The amount of time it takes your installer will depend on many factors, including the square footage of the space, the tile material type, and if they need to make intricate tile cuts.

Flooring transition strips can be secured to the subfloor using glue, nails, or screws. For a more secure installation, especially in high-traffic areas, using screws or nails is recommended as it reduces the risk of slippage. However, if aesthetic appeal is a priority, glue provides a cleaner, more seamless finish without any visible holes or screw heads.

Lack of durability is the most significant downside of painting tile. However, a painted tile backsplash doesn't see the same kind of action as, say, painted flooring tiles. For backsplashes, the durability of the finish is crucial because they often require cleaning. However, you can minimize the durability problem by using mild cleaners and water on the painted surfaces.

The Morgan Hill, CA homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.