Top-rated home builders.

Get matched with top home builders in Mayer, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Mayer, AZ?

Select your specific project to find the pro for you.

Find Home builders in Mayer

Avatar for A-R&R Construction Solutions
A-R&R Construction Solutions
4.8(
21
)
Shelter or Outbuilding - Build

Serving Mayer, AZ and surrounding areas

In business since 1989

Free estimates

Small jobs welcome

"Had a car run through our trailer home, which could not be fixed due to damage to the frame. Jim gave us a quote to demolish it, and the work was done. He has all the equipment needed to complete any job, and he does it efficiently and professionally, and completely cleaned the lot to be ready for a new mfh. He is the best contractor in my book."
overall view
OWNER
fire place
fire place
step replacement

+22

Response time2 days
Recommended by90%of homeowners
Avatar for G. Salisbury & Assoc., Inc.
G. Salisbury & Assoc., Inc.
5.0(
7
)
Find a Custom Home Builder

Serving Mayer, AZ and surrounding areas

In business since 2001

"I had a large outside remodel. Gersh and Terry were excellent to work with. His subcontractors were as well. Very transparent. Love the way my house looks - totally different! I would definitely use them again!"
Harrell Residents
Harrell Residents
Harrell Residents
Harrell Residents
Harrell Residents

+27

Response time1 day
Recommended by100%of homeowners
Avatar for Dakotah Construction LLC
Dakotah Construction LLC
5.0(
6
)
Shelter or Outbuilding - Build

Serving Mayer, AZ and surrounding areas

"Dakotah Construction was able to install a concrete in my property. The work was competent and the price was reasonable. In addition, they were able to work with minimal supervision and were able to deal with some fairly sticky officials (who were just doing their job, I guess). We negotiate contracts on a Request for Proposal basis. When we do our next project that requires concrete or excavation work, Dakotah Construction will definitely be at the top of the list of invitees."
Concrete - Pouring & Repair Project
Concrete - Pouring & Repair Project
Concrete - Pouring & Repair Project
Concrete - Pouring & Repair Project
Driveways - Concrete Project

+22

Recommended by100%of homeowners
Avatar for Four Seasons Construction AZ LLC
Four Seasons Construction AZ LLC
5.0(
2
)
Find a Custom Home Builder

Serving Mayer, AZ and surrounding areas

In business since 1998

Offers commercial services

Here at Four Seasons Construction AZ LLC, we pride ourselves on professionalism, attention to detail, and a dedication to our clients wants and needs. We will not leave a project until you are 100 percent satisfied. Feel free to give us a call!

Response time3 days
Recommended by100%of homeowners
Showing 1-10 of 25
Home Building questions, answered by experts

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

It pays to hire a project manager or general contractor when you have a large-scale project that will take over a week to complete, especially when it involves structural changes and multiple subcontractors. This includes hiring a general contractor to build a house, add an extension, or manage other projects that need a building permit.

If you want to make your home eco-friendly, enjoy low maintenance, and love the fact that its looks will take people’s breath away (and not because they were trying to blow your house down), then a modern brick home is right for you. You can hire a mason to get the building process started for your brick home.

But if you’re not fond of the color and don’t want to deal with the process of repointing or other repairs, consider going with vinyl or wood. These materials offer a lower cost. While they tend to require more maintenance, they don’t cost nearly the same as exterior brick house repair.

Construction typically takes 3-6 months, including site preparation and assembly.

There are energy-efficient options when building a cottage. Select green building materials, high-performance insulation, and energy-efficient windows when designing your cottage. Options such as solar panels, efficient HVAC systems, and LED lighting can lower your utility bills and reduce your environmental impact. Many builders offer energy-efficient upgrades as part of the design process.

The Mayer, AZ homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.