Top-rated subcontractors.

Get matched with top subcontractors in Palestine, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Palestine, AR?

Select your specific project to find the pro for you.

TRUSTED BY PALESTINE, AR HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon21
    Verified subcontracting services reviews

Find Subcontractors in Palestine

Avatar for Desotos On Call Handyman
Desotos On Call Handyman
4.5(
19
)

Serving Palestine, AR and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Warranties offered

Credit card accepted

"Mr. Collins did an excellent job. I need rotten wood replaced on my garage facing as well as my chimney box. He came and assessed the project and although the temperature was extreme he wisely came out in the cool of the evening, worked until dark and returned the next day to complete the job. The price was competitive but very reasonable. I am extremely satisfied and will be calling him back for other projects."
Bathroom Remodel
Before
After
Shower afterwards
Patio and carport with gable

+130

2 neighbors recently requested a quote
Recommended by72%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Palestine, AR and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Palestine, AR and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Aim Flooring & Paint LLC
Aim Flooring & Paint LLC
5.0(
3
)

Serving Palestine, AR and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Mr.Moto is very professional and was always on time. His work is beautiful, so much so that when my neighbors came to see my new floors they asked for his contact information. He is an extremely hard worker. I will most definitely use him again and happily refer him to my family and friends."
Remodeling - General Project
Flooring Sales/Installation/Repair Project
Additional Photos
Additional Photos
Additional Photos

+12

Recommended by100%of homeowners
Showing 1-10 of 16
Subcontractors questions, answered by experts

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Yes, professionals offer design services that ensure cohesive appearances.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

When conducting space planning, building codes and regulations need to be considered. As long as you are taking them into account and discussing them with the architect, you should be able to do your space planning appropriately.

The Palestine, AR homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.