Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Hartford, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Hartford, AL?

Select your specific project to find the pro for you.

TRUSTED BY HARTFORD, AL HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon34
    Verified backsplash installation services reviews

Find Backsplash installation pros in Hartford

Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Hartford, AL and surrounding areas

In business since 1992

Free estimates

"They placed cloths throughout the house each day they worked to protect our floors. They removed and replaced everything in our bathroom with expertise. This includes our bathroom floor, vanity/sink, removing tub and installing a complete show with glass doors. They also painted and installed a light/fan combo above our shower. We love everything!"
Dream Baths

+15

Recommended by82%of homeowners
Klein and Son Construction and Excavating
3.9(
50
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Hartford, AL and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"

Started off great, met with Fred Sr. 5 months before and talked about what I wanted done, gave him my vision of how I wanted it to look and gave him time to digest all that I wanted, and the budget I had to work with. Met with Fred Sr. again in Jan, firmed up what I wanted, we talked it great length about what I wanted done, and then did a walk thru of the home. Fred Sr. told me to ask for everything I could think of that I wanted done, and we developed a must have, want to have, if there is money left over would like to have list. Contract was signed, for work to start 1 Mar with a 8 week timeline, yep there is a lot to do. I was able to have the house open a week early and Fred Sr. jumped at the chance to start. Day one put a big smile on my face, kitchen and baths gutted, all flooring removed. Met Fred Jr and the rest of the crew. Fred Jr just as nice as Fred Sr, and the young boys very respectful and nice. Fred Sr has raised a great family. Each day I get an update and get the opportunity to add input. Love it. Will keep Angie's list updated with the progress.

Update: week 2

main bathroom has been framed and dry walled, new master bathroom created, framed and dry walled.  Fred Sr and Fred Jr have been great.  Some dead space was discovered on the new bathroom and Fred Jr made a linen/towel nook. The house is small and they are using every inch of space possible.  They are masters of redesign, I was able to gain a master bathroom without losing living space in the master bedroom.  There work is very efficient, I and never have seen the young boys without a project to do, no one sits around, and most of all they understand budget, only upgrades are ones I ask for, and they help to keep me on budget unlike other contractors that want to help you spend more.  Again Very Happy

Update: week 4

most all of the painting has been done, just some small areas left. Fred's people are great, the trim work fantastic, the lines perfectly straight. I am very critical of paint work, and able to spot small defect, but this was not the case, I looked everywhere and could not see even a 2mm difference in his lines.  The hold up this week is the cabinets I am having built, this is not Fred's fault but mine as I wanted custom cabinets.  Very excited to get the cabinets and countertops in.  Very very happy

late in the update:  work is mostly complete just some small things I want added.Cabinets and countertops installed, they are beautiful.  small problem with one of the cabinet doors, Fred went back to the maker of the cabinets and made him make me a new one.   Moved in, love my home.

Already hired Fred to do some outside work on the house too.

"
metal roof
Kitchen
Railings
Recommended by74%of homeowners
Avatar for Hollow Oak Restorations
Hollow Oak Restorations
4.7(
3
)
Tile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - InstallTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install - For Business

Serving Hartford, AL and surrounding areas

In business since 2018

Emergency services offered

"Mother's house had extensive damage from hurricane Michael. Hollow Oak came in and now it's good as new. They moved the furniture, tore out all the damage, replaced the damaged ceilings, painted, and then replaced the furniture. They made sure everything was clean before they left. They were complete professionals, even going the extra mile to insure my 93 year old mother was comfortable. They took the extra time to "work around" her bedroom (which also had ceiling damage which they repaired) so she could sleep in her own bed every night even though this cost them extra time and effort. If it was possible to give them a score better than an "A", I would definitely give it. I will use their services again is ever needed,"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by100%of homeowners
...
Showing 1-10 of 94
Backsplash Installation questions, answered by experts

If you’re out of spacers for your tile installation, you can use pennies. Each time you place a tile, stick the pennies around the edges (on the sides and the corners). Like working with spacers, you’ll want the same amount of space around each tile before they set.

It’s possible to walk on a clay tile roof, but you run the risk of breaking or cracking the tiles if you’re not careful, so it’s best not to walk on it if you can avoid it. If you or a contractor needs roof access, be sure to distribute your weight evenly and step on the portions of tile that are also supported underneath, which depends on your tile design. Walking on any roofing material is inherently dangerous, so wear rubber-soled shoes and use safety equipment if you need to access your roof.

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

Poured-in-place terrazzo flooring is more durable than tile. In fact, it’s one of the most durable types of flooring on the market. It can last anywhere from 40 to 100 years, depending on maintenance. On average, you can expect your terrazzo floor to last about 75 years, but you will have to make repairs as needed.

A cement backer board is not needed for laying tile on concrete. Sometimes referred to as a cementitious backer unit, or CBU, backer board should be used if the subfloor is plywood or OSB. The backer board provides a base on which to install the tiles that isn’t as likely to be damaged by any accidental water seepage as natural materials would be.

The Hartford, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.