Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Ozark, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Ozark, AL?

Select your specific project to find the pro for you.

TRUSTED BY OZARK, AL HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon46
    Verified backsplash installation services reviews

Find Backsplash installation pros in Ozark

Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Ozark, AL and surrounding areas

In business since 1992

Free estimates

"They placed cloths throughout the house each day they worked to protect our floors. They removed and replaced everything in our bathroom with expertise. This includes our bathroom floor, vanity/sink, removing tub and installing a complete show with glass doors. They also painted and installed a light/fan combo above our shower. We love everything!"
Dream Baths

+15

Recommended by82%of homeowners
Klein and Son Construction and Excavating
3.9(
50
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Ozark, AL and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"

Started off great, met with Fred Sr. 5 months before and talked about what I wanted done, gave him my vision of how I wanted it to look and gave him time to digest all that I wanted, and the budget I had to work with. Met with Fred Sr. again in Jan, firmed up what I wanted, we talked it great length about what I wanted done, and then did a walk thru of the home. Fred Sr. told me to ask for everything I could think of that I wanted done, and we developed a must have, want to have, if there is money left over would like to have list. Contract was signed, for work to start 1 Mar with a 8 week timeline, yep there is a lot to do. I was able to have the house open a week early and Fred Sr. jumped at the chance to start. Day one put a big smile on my face, kitchen and baths gutted, all flooring removed. Met Fred Jr and the rest of the crew. Fred Jr just as nice as Fred Sr, and the young boys very respectful and nice. Fred Sr has raised a great family. Each day I get an update and get the opportunity to add input. Love it. Will keep Angie's list updated with the progress.

Update: week 2

main bathroom has been framed and dry walled, new master bathroom created, framed and dry walled.  Fred Sr and Fred Jr have been great.  Some dead space was discovered on the new bathroom and Fred Jr made a linen/towel nook. The house is small and they are using every inch of space possible.  They are masters of redesign, I was able to gain a master bathroom without losing living space in the master bedroom.  There work is very efficient, I and never have seen the young boys without a project to do, no one sits around, and most of all they understand budget, only upgrades are ones I ask for, and they help to keep me on budget unlike other contractors that want to help you spend more.  Again Very Happy

Update: week 4

most all of the painting has been done, just some small areas left. Fred's people are great, the trim work fantastic, the lines perfectly straight. I am very critical of paint work, and able to spot small defect, but this was not the case, I looked everywhere and could not see even a 2mm difference in his lines.  The hold up this week is the cabinets I am having built, this is not Fred's fault but mine as I wanted custom cabinets.  Very excited to get the cabinets and countertops in.  Very very happy

late in the update:  work is mostly complete just some small things I want added.Cabinets and countertops installed, they are beautiful.  small problem with one of the cabinet doors, Fred went back to the maker of the cabinets and made him make me a new one.   Moved in, love my home.

Already hired Fred to do some outside work on the house too.

"
metal roof
Kitchen
Railings
Recommended by74%of homeowners
...
Showing 1-10 of 92
Backsplash Installation questions, answered by experts

Larger tiles can be difficult to install because they’re heavier and bulkier than their smaller counterparts, which makes them harder to haul around and put in place. Plus, if you don’t install the tiles correctly, they could crack or break. For these reasons, it’s best to hire a professional for large-format tile installation.

Poured-in-place terrazzo flooring is more durable than tile. In fact, it’s one of the most durable types of flooring on the market. It can last anywhere from 40 to 100 years, depending on maintenance. On average, you can expect your terrazzo floor to last about 75 years, but you will have to make repairs as needed.

Tile installation can be expensive because it requires more time and labor to install than many other materials. For example, laminate flooring can click and lock into place, and carpet comes in large rolls that you can secure to the floor. On the other hand, tiles need to be cut, laid individually, grouted, and left to cure.

You can lay tile directly on a plywood countertop, but if it’s a high-traffic surface in a kitchen, it’s better to add a moisture-resistant base. Plywood is susceptible to moisture, so if dampness seeps through from the surface around the sink or where you prep food, it can cause the plywood to warp, leading to grout damage, cracked tiles, or mold growth under the surface. 

Yes, even if you’re being careful, removing tile can damage your drywall to some degree. However, you can minimize the damage done to it by eliminating a majority of the grout and taking your time prying each tile off. Also, it's worth noting that you might have more drywall damages to deal with if your tile is set into the mortar.

The Ozark, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.