Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Jack, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Jack, AL?

Select your specific project to find the pro for you.

TRUSTED BY JACK, AL HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon14
    Verified backsplash installation services reviews

Find Backsplash installation pros in Jack

JAC Tile
New to Angi
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Jack, AL and surrounding areas

Approved

In business since 1993

Free estimates

Offers commercial services

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n\n

Response time1 hour
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Jack, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Handyman Services Unlimited
Handyman Services Unlimited
5.0(
8
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Jack, AL and surrounding areas

In business since 2010

Free estimates

Emergency services offered

Handyman Services Unlimited provides quality painting. We pay close attention to detail. We provide Interior and Exterior painting services to the Wiregrass Area. We have been in business for 13 years and our staff have over 20+ years of experience. We also provide a wide variety of Handyman Services in the Wiregrass area. We strive to satisfy all our customer's and we go the extra mile to make sure you're Completely Satisfied. Our team of skilled workers provides quality workmanship and Excellent Customer service to ensure your home is well -maintained and fully functional. We work closely with each client to understand their unique needs and preferences, and our commitment to customer satisfaction means we won't rest until you are 100% happy with our work.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+26

Recommended by100%of homeowners
Klein and Son Construction and Excavating
3.9(
50
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Jack, AL and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"

Started off great, met with Fred Sr. 5 months before and talked about what I wanted done, gave him my vision of how I wanted it to look and gave him time to digest all that I wanted, and the budget I had to work with. Met with Fred Sr. again in Jan, firmed up what I wanted, we talked it great length about what I wanted done, and then did a walk thru of the home. Fred Sr. told me to ask for everything I could think of that I wanted done, and we developed a must have, want to have, if there is money left over would like to have list. Contract was signed, for work to start 1 Mar with a 8 week timeline, yep there is a lot to do. I was able to have the house open a week early and Fred Sr. jumped at the chance to start. Day one put a big smile on my face, kitchen and baths gutted, all flooring removed. Met Fred Jr and the rest of the crew. Fred Jr just as nice as Fred Sr, and the young boys very respectful and nice. Fred Sr has raised a great family. Each day I get an update and get the opportunity to add input. Love it. Will keep Angie's list updated with the progress.

Update: week 2

main bathroom has been framed and dry walled, new master bathroom created, framed and dry walled.  Fred Sr and Fred Jr have been great.  Some dead space was discovered on the new bathroom and Fred Jr made a linen/towel nook. The house is small and they are using every inch of space possible.  They are masters of redesign, I was able to gain a master bathroom without losing living space in the master bedroom.  There work is very efficient, I and never have seen the young boys without a project to do, no one sits around, and most of all they understand budget, only upgrades are ones I ask for, and they help to keep me on budget unlike other contractors that want to help you spend more.  Again Very Happy

Update: week 4

most all of the painting has been done, just some small areas left. Fred's people are great, the trim work fantastic, the lines perfectly straight. I am very critical of paint work, and able to spot small defect, but this was not the case, I looked everywhere and could not see even a 2mm difference in his lines.  The hold up this week is the cabinets I am having built, this is not Fred's fault but mine as I wanted custom cabinets.  Very excited to get the cabinets and countertops in.  Very very happy

late in the update:  work is mostly complete just some small things I want added.Cabinets and countertops installed, they are beautiful.  small problem with one of the cabinet doors, Fred went back to the maker of the cabinets and made him make me a new one.   Moved in, love my home.

Already hired Fred to do some outside work on the house too.

"
metal roof
Kitchen
Railings
Recommended by74%of homeowners
IgnitePro Fireplace / Skillset Solutions
5.0(
3
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Jack, AL and surrounding areas

In business since 2023

Free estimates

Credit card accepted

"Absolutely thrilled with the pioneer pellet stove installation and fireplace service! The team was professional, efficient, and left our home spotless. Our new stove is a game-changer, and we could not be happier!"
Response time7 hrs
Recommended by100%of homeowners
Jones Construction
5.0(
4
)
Tile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - InstallTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install - For Business

Serving Jack, AL and surrounding areas

In business since 2000

Free estimates

I'm located in opp al and Andalusia al we will\ndo work in coffee county Al, dale county\nHouston county we also do remolding bathroom kitchen addition patio fences roofing metal and shingle\nwe open 7 to 7 Monday - Friday call 334 764\n3794. Free estimates up to 50 miles.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Avatar for Underwood Tile & Hardwood
Underwood Tile & Hardwood
4.3(
6
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Jack, AL and surrounding areas

In business since 1982

"After a month the grout in every corner crack. when they came back they said it was normal. But that was the reason I replace the old shower. ONE YEAR LATER I HAVE FOUND MORE CRACKS IN GROUT . They just caulked over the cracks . Said that's all they could do spend over 1000.0$ for tile and stones , No I would not refer them to anybody ....
"
Recommended by80%of homeowners
R&R Construction
3.8(
10
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Jack, AL and surrounding areas

In business since 2000

Free estimates

Warranties offered

Welcome to R&R Construction! We take pride in the quality of work and customer satisfaction that we give each customer! With over 20 years experience, we are known to pay exquisite attention to detail while making customer satisfaction our top priority. Call us today to learn more about how we can help you!

Restaurant remodel.
Bar top with pennies
Custom Bar
Barn wood bar facing
Close Up

+1

Response time2 days
Response rate88%
Recommended by87%of homeowners
...
Showing 1-10 of 80
Backsplash Installation questions, answered by experts

It’s easiest to start from an edge as it gives you a straight line. A problem may arise if your edge doesn’t line up perfectly, in which case it’s best to start from the center. Some think that starting tile from the center adds a focal point in the center of the hearth. 

No, when done correctly, removing the tile shouldn’t damage the subfloor. However, if there was pre-existing damage to the subfloor from standard use or lack of maintenance, the subfloor may need repairs. For example, if the contractors notice mold growth on the subfloor or an uneven surface, you may need more extensive services before installing new tile.

If you DIY tile removal, remove the tiles one step at a time, individually removing the tile, grout, and mortar to prevent unnecessarily damaging the subfloor. Depending on the age of your home, consider having a professional inspect the subfloor to ensure it’s in good enough condition to lay new tile.

Most professional shower tile installations take between six and eight hours, depending on the size and complexity. Most projects get completed in a single workday. DIY-ing the project takes around three to four days or roughly 16 hours. However, this will vary based on the skill level of the person completing the work.

No, tiling over painted walls or wallpapered surfaces is generally not recommended. Textured surfaces and paints will affect the adhesive, possibly causing tiles to lift or fall off. Painted walls with a semi-gloss or high-gloss finish are particularly difficult for adding tiles. It’s wise to strip the paint first if you install the tiles to drywall, although it’s still best to opt for a cement backer board.

As long as you follow the instructions on your peel-and-stick tile packaging, it should not damage your walls. A possible instance when you may accidentally damage your walls is if you install tiles improperly using additional adhesives that aren’t recommended.

Also, you can damage your walls if you’re not careful when removing tile. For example, you could accidentally make holes in the drywall with a paint scraper if you don’t heat the adhesive long enough before trying to pry it off.

The Jack, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.