Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Bryant, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Bryant, AL?

Select your specific project to find the pro for you.

TRUSTED BY BRYANT, AL HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon13
    Verified ceramic tile services reviews

Find Ceramic tile pros in Bryant

Mejias Flooring
New to Angi

Serving Bryant, AL and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's custom needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Bryant, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Bryant, AL and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
McNeil Flooring
5.0(
4
)

Serving Bryant, AL and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"They showed up early, explained everything i needed done, did it so quick i was literally stunned. I will never hire another company to do flooring or any small repair. I had rotten wood that they gladly replaced for me. My floor looks absolutely AMAZING. Don't miss out and hire these guys. They will indeed MAKE IT HAPPEN!"
McNeil Flooring
McNeil Flooring
McNeil Flooring
McNeil Flooring
McNeil Flooring

+23

Response time10 mins
Response rate86%
Recommended by100%of homeowners
...
Showing 1-10 of 90
Ceramic Tile questions, answered by experts

When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.

On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.

The best bathroom floor tiles are strong enough to withstand the weight of a clawfoot tub. However, professional tile installation is essential. If the tiles are uneven or improperly fixed, they may crack under the pressure. Be careful when installing the tub—if it drops or drags on the tiles, it could easily cause scratches or cracks.

Your floors should be completely level for tile, otherwise you risk damaging the tiles in the future. When there are even small gaps or hills in the subfloor beneath the tile, this puts more pressure on the tile when you walk around on the floor. With repeated traffic, the tiles are at risk of cracking, and you’ll have to deal with tile repairs sooner than if the floor was completely level.

Yes, provided you aren’t installing drywall over it. But you can skim coat it, apply new tile right on top, paint it, or stencil it. For more budget- and DIY-friendly options, you can install beadboard or apply decals. Just make sure that the current tiles are in good condition and prepped well for the paint or adhesive to stick.

Most professional shower tile installations take between six and eight hours, depending on the size and complexity. Most projects get completed in a single workday. DIY-ing the project takes around three to four days or roughly 16 hours. However, this will vary based on the skill level of the person completing the work.

The Bryant, AL homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"