Top-rated excavation pros.

Get matched with top excavation pros in Westover, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Westover, WV?

Select your specific project to find the pro for you.

Find Excavation pros in Westover

Avatar for BC Allen Company LLC
BC Allen Company LLC
4.4(
27
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Westover, WV and surrounding areas

Approved

In business since 2000

Free estimates

Emergency services offered

"Still in the beginning phase. Weather hasn’t cooperated. Sales representative Jeremy Winans is very knowledgeable and guided us through the entire process. We are having two ponds built and a new ICON home put between them. Brian VanDevender and his field crew have been very helpful and have taken the time to explain each step. Their approach to controlling water from 5 springs and a small drainage creek has worked exceptionally. We’ve got 10 days of no rain in the forecast and I expect that will allow completion on schedule. I would recommend VanDevender Construction for any job as of today and don’t see me changing my mind."
Grading-Sloping
New Steps
Major Grading
Major Grading
Hill Side

+14

Response time2 days
Recommended by95%of homeowners
Avatar for B&K Land Works
B&K Land Works
5.0(
8
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Westover, WV and surrounding areas

Approved

In business since 2015

Free estimates

Small jobs welcome

"Communication with B and K / Hoffman Excavating was excellent from the beginning. The contact person was Jeremy- he was focused, friendly and professional as I explained the project and my goals for completing it. The discussion was straightforward and constructive- then the agreed scope of the project was clearly listed in the contract. That transparency was unlike other contracts presented to us in our search for a professional. Many of those were so vague that we couldn't sign them. Jeremy worked with all groups needing to issue permits for the work to be done, including the HOA for the gated community where the project would be done. Once the physical work started, they remained in daily contact, supplying pictures and videos since we couldn't be there to see progress. Changes were only made after we both understood and agreed. Upon completion, the workers did a FaceTime video so I was comfortable submitting final payment, I don't have a single complaint! I would hire them again."
Rock Removal
Response time1 day
Response rate98%
3 neighbors recently requested a quote
Avatar for C & A Construction
C & A Construction
5.0(
6
)
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Westover, WV and surrounding areas

In business since 2007

"We needed it done quickly. Brock drove from Buckannon area to Bridgeport area on a Saturday morning. He drove his excavator 2/10the of a mile up a narrow drive that was solid ice. He got the job done, site cleaned up and his price was very reasonable. I would recommend him without hesitation. Integrity and responsive to our needs. Good outfit."
Response time6 hrs
Response rate100%
Recommended by16%of homeowners
...
Showing 1-10 of 60
Excavating questions, answered by experts

You can bury underground electrical wire six inches deep—but only if you use a rigid metal electrical conduit. For rigid, non-metallic conduits, bury the wire at least 12 inches deep. If using an underground feeder cable rated for direct burial, you'll need to place it at least 18 inches deep, as it has no conduit for extra protection.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Drilled wells have a pipe sticking up that’s covered in a plastic or metal casing. On the other hand, a dug well will look like a big hole in the ground and is more similar to what you’d see in a fantasy or Western movie. If you want to be sure, contact the city for documentation on your property’s construction and excavation history. 

Call 811 to locate and mark the gas lines at least three days before digging. In many areas, you can dig within 18 inches of the lines, though in some locations, the distance may be further. Check local regulations, as you may need a utility company representative onsite when digging. Document your calls to 811 and precautions taken to avoid gas lines. A homeowner can be held liable for hitting a gas line in some cases, but contacting the proper authorities and following all guidelines can offer protection.

Depth is not a qualifying component of evacuation. Any human-made cut, cavity, or depression in the earth’s surface is considered excavation. The hole from excavation can be any size, shape, or depth. Excavation is used to create foundations, reservoirs, drainage ditches, and roads. Long, narrow excavations are called trenches and are often used for underground utilities.

The Westover, WV homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.