Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Westover, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Westover, WV?

Select your specific project to find the pro for you.

TRUSTED BY WESTOVER, WV HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon13
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Westover

...
Showing 1-10 of 60
Asphalt Driveways questions, answered by experts

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

In terms of durability, concrete driveways can last more than 50 years when properly maintained, compared to the typical 30 years for an asphalt driveway. However, the durability depends on the climate, base material and thickness, and thickness of the concrete or asphalt used. The longevity of concrete or asphalt driveways also depends on how well it’s maintained and the amount of wear and tear it endures.

Costs range from $3 to $7 per square foot, depending on the area size and project scope.

The three most common types of asphalt are hot asphalt, MC cold mix, and UPM asphalt. Hot asphalt is used most often for paving and patching roadways while it’s hot and workable. MC cold mix asphalt cures more slowly than hot asphalt, but it can be used for temporary patches and repairs in low-traffic areas. UPM is also used cold, but it can be used as a longer-term fix, usable in almost any conditions at almost any temperature.

Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.

The Westover, WV homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.