Top-rated excavation pros.

Get matched with top excavation pros in Carmichaels, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Carmichaels, PA?

Select your specific project to find the pro for you.

Find Excavation pros in Carmichaels

Avatar for Fazio Excavating LLC
Fazio Excavating LLC
5.0(
6
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Carmichaels, PA and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"Fazio excavating is remarkable. Incredibly responsive and conscientious about doing things right. This team goes above and beyond. Easy to see they take pride in their work. Very courteous and efficient. Highly recommend!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Response time4 days
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for ESC Excavating LLC
ESC Excavating LLC
5.0(
2
)
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Carmichaels, PA and surrounding areas

Approved

In business since 2018

Free estimates

Small jobs welcome

Established is 2018, Owner Evan S Crichfield brings over 15 years of experience and knowledge to the construction/ excavation field. When choosing ESC Excavating you get to experience exceptional work quality and service that won?t disappoint. We at ESC cover a wide range of work which makes us your ?one stop shop?. Work included but not limited to, drainage, underground utilities, grading, demolition, forestry mulching, heaving mowing/ brush hogging/ field planting and land clearing. Based out of Washington Pa, we service a wide range of demographic. ESC Excavating is also willing to travel outside our service areas for the right job. Feel free to contact us at 724-413-5226 call/ text or email at [email protected]. We look forward to hearing from you.

old structure
old structure
ongoing demo
ongoing demo
demo and grading completed

+19

Response time8 hrs
Avatar for Sloan Construction Company
Sloan Construction Company
New to Angi
Building Site - Preparation and Clearing - For Business

Serving Carmichaels, PA and surrounding areas

Approved

In business since 1988

Free estimates

Offers commercial services

We're a locally owned and operated company with over 22 years of industry experience. We value honesty and integrity in all aspects of our business. We offer a variety of Home Improvement services that are customizable to each individual project. Thank you for choosing Sloan Construction Inc

Response time10 mins
...
Showing 1-10 of 57
Excavating questions, answered by experts

Your contractor should handle dust control during the project. It's best to speak with your contractor beforehand to check if they plan to cover your furniture, protect your vents, or use fans to redirect dust. Eliminating drywall dust is a particularly large challenge during construction, so always take this into account during your planning phase.

The digging depth will depend on the size of the trencher you use. Even smaller units can dig up to 4 feet deep, which is plenty for a DIY job. However, much larger trenchers can reach a depth of 18 feet and are better used by a team of pro contractors, not a single DIYer. As with all home improvement projects, use the right tool for the job and proceed with caution.

Digging a bush up by the roots is the most natural DIY method for removing a bush stump. Start by identifying the shrub type and revealing its roots. Cut the shrub to its base and loosen the soil, ensuring no utility lines are nearby. Optionally, treat the base with herbicide, then dig around the roots and cut a circle around the shrub using various tools. Dig a trench, cut the base of the root ball, and finally fill the hole to prevent regrowth. This thorough process ensures complete removal without damaging surrounding areas.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

The Carmichaels, PA homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.