Top-rated subcontractors.

Get matched with top subcontractors in Seymour, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Seymour, WI?

Select your specific project to find the pro for you.

TRUSTED BY SEYMOUR, WI HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon469
    Verified subcontracting services reviews

Find Subcontractors in Seymour

Avatar for HAPPY HOME REMODELING, LLC
HAPPY HOME REMODELING, LLC
4.7(
30
)
Major Home Repairs (General Contractor)

Serving Seymour, WI and surrounding areas

Approved

In business since 2017

Free estimates

Warranties offered

"Craig and his crew are great. I first came to know of Happy Home Contracting when my father was battling a terminal form of cancer. I saw Craig's truck down the road and I needed some help remodeling parts of my father's house that had been deeply abused by renters. Craig was reliable, charged a fair price, and does really quality work. He helped recreate a bathroom upstairs that really previously looked like it was from a slum house. The final result was something beautiful, modern, open, and full of light. He is easy to work with. He is someone that I trust deeply. And someone you can feel good about talking through concerns or questions throughout the process."
New countertops, new sink and faucet, painted existing cabinets, new hardware, new stove, and new fridge will arrive soon.
After Picture: New subway tile, grout, caulk, outlets, switches, and faceplates
Zillow proof of purchase, bought for $10,000 and sold for $105,000.
Madison Bathroom Remodel
Before and After of rec room. New everything.

+116

Response time4 days
Response rate100%
3 neighbors recently requested a quote
Avatar for Wilmet Construction LLC
Wilmet Construction LLC
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Seymour, WI and surrounding areas

Approved

In business since 2025

Free estimates

Small jobs welcome

"Dante was very professional in reviewing the project details with me on site and gave me price options which was simple to understand. He was very prompt with his response. I wasn't able to move forward with the project due to unexpected engine repairs for my vehicle. But I will definitely consider reaching out to him when I decide to proceed to move forward."
Framing
Basement remodel
Basement remodel
Basement remodel
Basement remodel

+18

8 neighbors recently requested a quote
A O Handy
4.1(
133
)
Major Home Repairs (General Contractor)

Serving Seymour, WI and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"At the end of the inspection I was positive that I was not going to use him. He gave me like a huge laundry list of things that needed to be done. After he was finished he said that it would cost me $15000. There was no way all of this going be $15000. It was like these little things he tarried about because he wanted to get paid as the coupons were so cheap. He had no suggestions about minimum cost. The thing about him was he did not give us any options, everything he gave was for us to do things. There are always levels of priority and I did not get anything at all from him."
Recommended by87%of homeowners
Avatar for Stendahl Exteriors
Stendahl Exteriors
4.1(
252
)
Major Home Repairs (General Contractor)

Serving Seymour, WI and surrounding areas

In business since 2005

Credit card accepted

"He came out and checked the roof. Though it is a 35 year old roof, with respect to what its lifespan should be, he noted that it is looking a bit older even though it is only about 25 years old. He said that in a few more years it will be time to replace it. Other than that, there were no major problems to report. So even though it is not good news that I will have to replace it in a few years, I did not get the impression that he was trying to see me one. If I needed a roof I would certainly take an estimate from him."
Before
During
Completion
Before
During

+3

Recommended by82%of homeowners
Avatar for PK Pro Contracting
PK Pro Contracting
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Seymour, WI and surrounding areas

In business since 1983

Credit card accepted

"They were great. I recently opened my new suite and needed flooring that wouldn’t ruin the base boards and the carpet. They did just that. They finished in a day and some hours. Also I needed them pretty last minute and he came asap and started working on the floors. It looks amazing. Highly recommend."
Before
After
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Showing 1-10 of 38
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

The best way to start designing a house is to know what you want before designing. Making a list of your biggest priorities in a home will help. Designing a house without an idea of what you need or want in a home will lead to many trials and errors that could make it harder to figure out what you need in your design.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

The Seymour, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.