Top-rated subcontractors.

Best subcontractors near Howard, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Howard, WI?

Select your specific project to find the pro for you.

TRUSTED BY HOWARD, WI HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon810
    Verified subcontracting services reviews

Top-Rated Subcontractors in Howard - Updated Nov 2026

Avatar for HAPPY HOME REMODELING, LLC
HAPPY HOME REMODELING, LLC
4.7(
30
)
Major Home Repairs (General Contractor)

Serving Howard, WI and surrounding areas

Approved

In business since 2017

Free estimates

Warranties offered

"Craig and Katie run a great operation here with Happy Home Contracting. We used them to help with our kitchen remodel in November, 2022. Their team spent several days with us, working on items ranging from flooring and tile work to ceiling work and painting. Their team cares about doing quality work, and it shows. Craig is an excellent communicator, which makes things run smoothly. Highly recommended. - Todd"
New countertops, new sink and faucet, painted existing cabinets, new hardware, new stove, and new fridge will arrive soon.
After Picture: New subway tile, grout, caulk, outlets, switches, and faceplates
Zillow proof of purchase, bought for $10,000 and sold for $105,000.
Madison Bathroom Remodel
Before and After of rec room. New everything.

+116

Response time4 days
Response rate100%
3 neighbors recently requested a quote
Avatar for Wilmet Construction LLC
Wilmet Construction LLC
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Howard, WI and surrounding areas

Approved

In business since 2025

Free estimates

Small jobs welcome

"Dante was very professional in reviewing the project details with me on site and gave me price options which was simple to understand. He was very prompt with his response. I wasn't able to move forward with the project due to unexpected engine repairs for my vehicle. But I will definitely consider reaching out to him when I decide to proceed to move forward."
Framing
Basement remodel
Basement remodel
Basement remodel
Basement remodel

+18

8 neighbors recently requested a quote
Avatar for Armon Renovations
Armon Renovations
5.0(
5
)
Major Home Repairs (General Contractor)

Serving Howard, WI and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

"Armon Renovations did several projects on my home including garage tear down & rebuild, tear out and replace concrete porch, new roof, siding & gutters & installation of a vinyl fence. Quincy Armon was very responsive & addressed any concerns I had. Overall, I am very happy with the work done."
Garage build
Garage build
Custom home build
Custom home build
Custom home build

+8

Response time7 hrs
Response rate98%
1 neighbors recently requested a quote
Avatar for PK Pro Contracting
PK Pro Contracting
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Howard, WI and surrounding areas

In business since 1983

Credit card accepted

"They were great. I recently opened my new suite and needed flooring that wouldn’t ruin the base boards and the carpet. They did just that. They finished in a day and some hours. Also I needed them pretty last minute and he came asap and started working on the floors. It looks amazing. Highly recommend."
Before
After
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Showing 1-10 of 37
Subcontractors FAQs, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Costs depend on project complexity, software requirements, and the draftsperson’s experience.

Adequate storage, workspaces, and energy-efficient systems are key considerations.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The Howard, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.