Top-rated subcontractors.

Get matched with top subcontractors in Manawa, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Manawa, WI?

Select your specific project to find the pro for you.

TRUSTED BY MANAWA, WI HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon115
    Verified subcontracting services reviews

Find Subcontractors in Manawa

Avatar for HAPPY HOME REMODELING, LLC
HAPPY HOME REMODELING, LLC
4.7(
30
)
Major Home Repairs (General Contractor)

Serving Manawa, WI and surrounding areas

Approved

In business since 2017

Free estimates

Warranties offered

"Craig and his crew are great. I first came to know of Happy Home Contracting when my father was battling a terminal form of cancer. I saw Craig's truck down the road and I needed some help remodeling parts of my father's house that had been deeply abused by renters. Craig was reliable, charged a fair price, and does really quality work. He helped recreate a bathroom upstairs that really previously looked like it was from a slum house. The final result was something beautiful, modern, open, and full of light. He is easy to work with. He is someone that I trust deeply. And someone you can feel good about talking through concerns or questions throughout the process."
New countertops, new sink and faucet, painted existing cabinets, new hardware, new stove, and new fridge will arrive soon.
After Picture: New subway tile, grout, caulk, outlets, switches, and faceplates
Zillow proof of purchase, bought for $10,000 and sold for $105,000.
Madison Bathroom Remodel
Before and After of rec room. New everything.

+116

Response time4 days
Response rate100%
4 neighbors recently requested a quote
Avatar for Stendahl Exteriors
Stendahl Exteriors
4.1(
252
)
Major Home Repairs (General Contractor)

Serving Manawa, WI and surrounding areas

In business since 2005

Credit card accepted

"He came out and checked the roof. Though it is a 35 year old roof, with respect to what its lifespan should be, he noted that it is looking a bit older even though it is only about 25 years old. He said that in a few more years it will be time to replace it. Other than that, there were no major problems to report. So even though it is not good news that I will have to replace it in a few years, I did not get the impression that he was trying to see me one. If I needed a roof I would certainly take an estimate from him."
Before
During
Completion
Before
During

+3

Recommended by82%of homeowners
Avatar for JC Elevation Team LLC
JC Elevation Team LLC
5.0(
5
)
Major Home Repairs (General Contractor)

Serving Manawa, WI and surrounding areas

In business since 2021

Free estimates

Warranties offered

General Remodeling: Flooring, Bathrooms, Kitchens, Windows, Doors, Paintings and more! We pride ourselves on the quality work we provide, while delivering great customer service. Check out all the services we offer below and call -or- click to schedule a free estimate today!

Painting - Exterior Project
Siding Project
Roofing Project
Painting - Exterior Project
Siding Project

+33

Response time4 days
Response rate100%
Recommended by100%of homeowners
Showing 1-10 of 23
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Costs depend on project complexity, materials, labor, permits, and required revisions.

Yes, designing builds to fit space constraints and meet functional needs.

Building permits serve a few purposes, the most important of which is to keep you and the people around you safe by ensuring your contractor does work safely and to code. Permits also help your municipality tax your property appropriately, as taxes are based on land improvements and the upgrades you make to your home. Finally, permits ensure your project won’t have a negative impact on the environment or your neighbors.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

The Manawa, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.