Top-rated paving pros.

Get matched with top paving pros in Juda, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Juda, WI?

Select your specific project to find the pro for you.

TRUSTED BY JUDA, WI HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon13
    Verified paving services reviews

Find Paving pros in Juda

Avatar for VP Trucking LLC
VP Trucking LLC
4.5(
1
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Juda, WI and surrounding areas

In business since 2021

Free estimates

Credit card accepted

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We offer a variety of hauling delivery services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Response time6 days
Avatar for Custom Masonry Specialists LLC
Custom Masonry Specialists LLC
2.9(
13
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeInterlocking Pavers for Patios, Walks & Steps - Install

Serving Juda, WI and surrounding areas

In business since 1998

Emergency services offered

Credit card accepted

"Installed Mendota Basic gas insert fireplace:  Install went OK except I preferred to use my electrician and there was a mix up between contractors about how to install the wiring so it had to be done over.  Jim tested the fireplace several times.  He gave good instructions to a carpenter about building a box to support the insert. 
Stone tile around the insert:  Jim did a beautiful job, and he arranged the tiles just the way I wanted them.  He worked with my carpenters to design the framing to accommodate the design for wood trim and mantle that I wanted. 
Rebuilt the chimney from the roof up:  The masonry itself is professional.   This took a long time to complete due to the long winter and to various excuses (e,g, deaths, illnesses, other jobs started after ours).   The scaffolding was left up longer than promised and that annoyed the neighbor who could not use his driveway.  Communication on this issue was difficult for all of us.
Concrete cap on chimney:  This looks great.  Jim forgot to do a little piece of cap on the side, but he came back and did it later, no questions asked. 
Tuck pointing: Grinding went well.  Missed a few "bee holes" the first time round.  Jim came back later and filled those in.  
Waterproofing:  this went well.
Block cutting and installing a larger glass block window: Glass block looks great, and matches the other glass block windows in the basement. 
Window well:  Jim used landscape blocks that matched the style and color of a window well around another basement window.  The blocks are level and fit exactly.  They look great. 
Fireplace doors:  Jim picked doors of a style I wanted.  Installation was professional.  I was disappointed that the doors don't seal airtight as I had understood when we initially discussed the job.  I felt this should have been discussed more before the doors were installed.
Epoxy floor:This didn't go so well.  The grinder left many semi-circular and circular gouges in the floor which could not be ground out.  So the floor is very uneven.  Perhaps this was due to the quality of the existing concrete, but I don't really know.  Then the epoxy paint he used didn't cover the floor.  Jim did this over at his expense.  
Communication:  Early on, Jim kept me well-informed about when he would come and arrived as planned.  However, there were times when calls and emails went unanswered for days.   Scaffolding that blocked the neighbor's driveway was not removed when promised.   During the second contract, the number of unanswered calls increased.  Several times Jim promised to come and did not show up or explain why, which delayed all the other work that had to wait until after the floor was redone.  It also meant I was having to arrange for my daughter to be elsewhere on days even when he didn't show up and put off other contractors.  This happened at least half a dozen times.    
Timeliness: There were several delays on the first job, attributed to weather but not entirely due to that, so the job took longer than we expected.  Therefore,  in the second contract we specified a start date (April 26, 2013) and an end date (May 10, 2013) and a penalty for missing the date.  The job was not complete until the end of August, when he came to install the fireplace doors, to complete the tuck-pointing and waterproofing and to redo the floor.  
 


"
Finished product...
New home.
Recommended by44%of homeowners
Showing 1-10 of 25
Paving Services questions, answered by experts

The ideal distance between stepping stones depends on your design preference. A general rule is to place them about 24 inches apart from center to center to match an average person's stride. Another common approach is to leave about 6 inches of space between the edges of each stone; this can be adjusted to fit the path's total length without cutting pavers. If you plan to plant between the stones, leave at least 6 to 8 inches of space to give the plants room to grow.

The layer of polymeric sand under the pavers plus the polymeric sand that gets swept into the joints between your pavers holds them in place in a few ways. For one, the gritty texture of the sand helps lock the pavers together. Polymeric sand also contains bonding agents that get activated by water. Polymeric sand will take between 24 and 48 hours to fully cure, so do not walk on your paver walkway before this time.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

Permeable paving is a good option for a lot of reasons. It can help prevent flooding, keeps harmful chemicals from polluting our water, and can divert water away from your home’s foundation. Plus, it can add a rustic aesthetic to your outdoor area, might prevent pests who breed in water, and may even qualify for tax rebates.

A traditional driveway gate isn’t your only option when installing a barricade in front of your driveway. A security gate like a swing gate, double swing gate, bi-folding gate, vertical gate, or pivot gate could work just as well as your driveway gate—if not better for your home depending on which qualities you’re after. Like sliding driveway gates, many of these alternatives work with automatic features that simplify entering and exiting your property.

The Juda, WI homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.