Top-rated home builders.

Get matched with top home builders in Sultan, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Sultan, WA?

Select your specific project to find the pro for you.

TRUSTED BY SULTAN, WA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon28
    Verified home building services reviews

Find Home builders in Sultan

Near Me Roofing Company
5.0(
74
)
Find a Custom Home Builder

Serving Sultan, WA and surrounding areas

Approved

In business since 2012

Free estimates

Credit card accepted

"We had our home's entire roof replaced by Near Me Roofing Company. After getting several quotes,, and we were certainly not disappointed in our selection. The job took an entire day, from early morning until evening, but in the end, Ari and Elijah left the job site very clean, their workers were courteous throughout and, most importantly, we now have a beautiful new roof."
Response time4 days
Recommended by80%of homeowners
Avatar for Steve's Home Services, LLC
Steve's Home Services, LLC
2.7(
39
)
Shelter or Outbuilding - Build

Serving Sultan, WA and surrounding areas

Approved

In business since 2011

Free estimates

Emergency services offered

"Steve and his crew are very dedicated and attentive. We hired them to help with a bathroom and kitchen remodel, and do several odd and ends jobs around our home. They are a pleasure to have in our home. They work hard and pay attention to detail. When mishaps occur, they are quick to correct. They strive to please and meet deadlines. Thank you Steve for a great experience. We hope you will be our go to guy for whatever home services we need."
Deck rebuild
complete kitchen remodel
replace hardwood floors
Yes we do yard service
You want to do tile?

+34

Response time3 hrs
Response rate100%
Recommended by73%of homeowners
Avatar for Iron Earth Construction LLC
Iron Earth Construction LLC
5.0(
4
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Sultan, WA and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

"They quickly assessed the situation, gave a reasonable quote, and were very proficient and professional. My condo unit was under contract and a water leak caused by another unit needed to be repaired asap and they did it. Also kept me well informed."
Before
During rooftop build
Rooftop Deck during
AFter
Installation of Euro Fencing

+43

Response time3 days
41 neighbors recently requested a quote
Recommended by75%of homeowners
Avatar for Sentri Homes
Sentri Homes
2.9(
47
)
Find a Custom Home Builder

Serving Sultan, WA and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"The contracted the work off to a third party. Jon took longer than expected. The windows was installed pretty good from the looks. Communication could have been better with knowing the job will take longer and what types of trims I wanted for the windows. As the contractor that was hired for this job by this company. Did a good job with putting up decent trim. As for the new windows they look great. I purchased the myself and hired sentri homes to install them. I will need to have a my siding on my house redone to be closer to the new windows so the gaps are not so obvious. That was not expected at first. But from old storm windows and not knowing how they were put in originally. There was some unknown things that was learned from the job being completed. I will have the siding of the house slightly done to match really good for what I wanted later on. My only concern is better communication with sentri homes. Overall they were great when I did talk to them."
20 neighbors recently requested a quote
Ascended Constructions
New to Angi
Find a Custom Home Builder

Serving Sultan, WA and surrounding areas

Approved (Corporate)

In business since 2023

Offers commercial services

We’re a family owned and operated company that values honesty and integrity, and stands behind our work. We offer over 40 years of industry experience. We specialize in Asphalt Shingle Roofing installation, replacement, and repairs. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We look forward to building long-term relationships with our clients and guarantee your satisfaction!

1 neighbors recently requested a quote
Avatar for Sami Construction, LLC
Sami Construction, LLC
5.0(
14
)
Find a Custom Home Builder

Serving Sultan, WA and surrounding areas

In business since 2020

Free estimates

Warranties offered

"We hired Sami Construction to remodel a bathroom, re-tile a fireplace, replace carpet throughout our house and replace some water damaged siding on the outside of our house. They were reasonably priced, responsive, completed the projects quickly and delivered quality results. They were pleasant to work with. I highly recommend them and would hire them again for any work inside or outside my house."
Response time1 day
Recommended by81%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Sultan, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Squire Creek Construction
5.0(
8
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Sultan, WA and surrounding areas

In business since 1998

Emergency services offered

Warranties offered

"I found squire creek very experienced and professional, they started promptly each morning put in long days. This was an owner builder project and Pete Stewart was very helpful in this process and really made running the job myself possible"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+12

Recommended by100%of homeowners
...
Showing 1-10 of 97
Home Building questions, answered by experts

It is a good idea to check in with your local city and state regulations before committing to building a shipping container home no matter where you live. This concept is pretty new across the country, and many places won’t let you build one.

The International Code Council (ICC) offers guidelines for home builders on the safe use of ISO intermodal shipping containers repurposed as building components, which can be helpful to review when planning or designing a shipping container home.

While some highly experienced homeowners can frame a house independently, it is not advisable. You will need ample carpentry experience, a team of helpers, and professionals to sign off on your work to meet local building codes. For the safest outcome, we recommend buying or building a house with the guidance of professionals.

Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

A construction-to-permanent loan is the most common type of mortgage used to finance a house teardown and rebuild. These loans include financing for construction costs and convert to a long-term mortgage once construction is complete. Check the terms of the loan closely before beginning work—there are often restrictions requiring you to use licensed contractors for all work.

The Sultan, WA homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.