Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Morton, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Morton, WA?

Select your specific project to find the pro for you.

TRUSTED BY MORTON, WA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon16
    Verified backsplash installation services reviews

Find Backsplash installation pros in Morton

Avatar for Cover Pro Painting
Cover Pro Painting
4.1(
56
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Morton, WA and surrounding areas

In business since 2004

Free estimates

Credit card accepted

"It went great!! Harry Wheeler is amazing! I needed this done as soon as possible when I contacted him and he made it happen. I needed these repairs done to sell my home and he came through for me. The price was more than I had anticipated, but the service he provided was well worth the price."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+60

Recommended by87%of homeowners
Avatar for Scatter Creek Construction, LLC
Scatter Creek Construction, LLC
4.1(
30
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Morton, WA and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"The project included a purchase of a new fireplace and a remodel of the mantel and fireplace surround.  I contracted with Jake of Scatter Creek Construction earlier in the year for a roofing repair/remodel and was highly satisfied with the project. This project required three phases. First the removal of the old mantel and surround as well as the preparation for removal of the old fireplace.  The second phase was the installation of the new fireplace.  The third was remodel of the fireplace wall including a mantel, tile surround, and box insert for the multimedia center.    Scatter Creek was contracted for phase 1 and 3.  A local fireplace retailer handled phase 2.  Jake and I met to review the conceptual design and plan the work.  He explained the work breakdown structure, sequence of events, and the expected time frames to complete the different work activities.   The primary materials needed were to select the type of tile for the fireplace surround and the wood type and design for the mantel shelf.  I did most of my research on the web, went to local home improvement stores to view the tiles and mantels we had in mind, and sent pictures and web links to Jake for him to provide the bid. He estimated that the project work would take less than a week to complete. Jake was hard to get hold of and, when I questioned if he was interested in the project, he finally got back to me. Because of the delay in getting the bid finalized we missed an opportunity for the fireplace installer consequently delaying the project for 25 days.  I removed all the furnishings in the room except for the couch and love seat, which Jake offered to move.  When Jake arrived for the room prep he was not equipped to move the furniture but covered it instead.  My wife fretted over the furniture for the duration of the project. Jake was responsible for the fireplace removal prior to the fireplace installation.  When the fireplace installer arrived the fireplace hadn't been removed.  Fortunately the fireplace retailer worked with us and convinced his installer to remove the old unit for an additional price.  Jake offered an apology and covered the costs but did not provide a good reason for the mix up.  The wall construction and tiling was dirty work and although Jake cleaned up some at the end of each day there was still a considerable amount of dust throughout the house.  At one point I had to inform Jake that the dirt left on the brand new fireplace during the tile and grout work left me pretty frustrated with the process.  The job also took three weeks to complete which didn't seem unreasonable considering the work performed but definitely was disappointing for my wife who felt she was promised one week to complete. At the conclusion of the project the outcome came out just as I had visualized and what Jake had convinced me he could do in his proposal.  I thought the pricing was fair, the craftsmanship was superior, and we are enjoying our remodeled living space.   Although the outcome was a success, the process had it's flaws with miscommunications, an over promise and under delivery on completion date, and at times the poor condition of the area of the house being worked on."
Before.
After.
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by84%of homeowners
Avatar for Precision Tile
Precision Tile
4.0(
4
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Morton, WA and surrounding areas

Emergency services offered

"Edgar and his crew did a fantastic job of remodeling our 69 year old bathroom! Communication was great and the job was completed in the time frame he stated. The upgrade from a cast iron bathtub to a tile walk in shower is amazing! Don't hesitate, hire Precision Tile and Home Remodel to do your remodel today!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+93

Recommended by100%of homeowners
Showing 1-10 of 29
Backsplash Installation questions, answered by experts

Grout lines should typically be between 1/8 to 3/16 inch thick. This ensures enough room for the grout to dry properly and makes them wide enough to look clean and professional. If grout lines are too small, it can be easier to see imperfections in the spacing. 

Flooring transition strips can be secured to the subfloor using glue, nails, or screws. For a more secure installation, especially in high-traffic areas, using screws or nails is recommended as it reduces the risk of slippage. However, if aesthetic appeal is a priority, glue provides a cleaner, more seamless finish without any visible holes or screw heads.

Yes, you can tile over existing tiles in a bathroom, but it is not always recommended. For this method to be successful, the original tile surface must be clean, flat, and free of damage such as cracks, unevenness, mold, or mildew. While tiling over existing tiles can save time and money, there are potential drawbacks. The new adhesive may not bond properly, and the process adds extra weight to the wall or floor. Additionally, the increased height of the surface could interfere with door clearances. For the best and most durable results, removing the old tiles before installing new ones is generally the better option.

Removing old tiles can be more complicated, but it can also be more manageable, depending on your circumstances. Typically, old tile is hard to remove because the adhesive had loads of time to bond with your wall, becoming a formidable foe between you and your new tile installation project. On the other hand, old tile in high-traffic areas can become loose, making it much easier to remove.

Lack of durability is the most significant downside of painting tile. However, a painted tile backsplash doesn't see the same kind of action as, say, painted flooring tiles. For backsplashes, the durability of the finish is crucial because they often require cleaning. However, you can minimize the durability problem by using mild cleaners and water on the painted surfaces.

The Morton, WA homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.