Top-rated stucco pros.

Get matched with top stucco pros in Brinnon, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your stucco service project in Brinnon, WA?

Select your specific project to find the pro for you.

Find Stucco pros in Brinnon

Avatar for DaBella - Bremerton (Siding)
DaBella - Bremerton (Siding)
3.8(
1,136
)
Traditional Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace

Serving Brinnon, WA and surrounding areas

Approved (Corporate)

In business since 2011

Free estimates

Warranties offered

"Great presintation! They explain all about roofing, product, if there will be any extra cost wood, look in your attic for damages, 3d pictures of your roof how it will look like after it's been done. Added extra ventilation where needed. Clean up was great. I have Dish, they paid the cost to have Dish come back out. There was no surprises! They delivered product one day, next day they removed old wood and replaced with new and extra ventilation. It's just beautiful! They went beyond did extra safety steps for the customer. My roof looks great, beautiful and I can't stop looking at it. We have the roof for Idaho weather not California. The cost is high but you will have a nice product you will not have to worry about for a very very long time. I would recommend this company they are a top quality roofing company."
Baths
Baths
Baths
windows
windows

+15

4 neighbors recently requested a quote
Recommended by89%of homeowners
Palm Construction and Remodeling, Inc.
5.0(
118
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Brinnon, WA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

It can be a daunting task looking for not only the right contractor for your job but also the right contractor for you. We completely understand what you're going through. We know every customer has different desires, different needs and different schedules. We're not only here to turn your ideas into reality but to make it a memorable experience every step of the way. Call us right now, no matter where you are in the planning process.

Response time3 days
Avatar for Honeycomb Construction
Honeycomb Construction
4.8(
40
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Brinnon, WA and surrounding areas

In business since 2019

Free estimates

"I was recently seeking a contractor on Angi for an urgent interior paint project at my home with quick turnaround time. This bedroom paint project included wall paint (2 colors; 1 accent wall), wall baseboard trim repair + paint, door trim repair + paint, door paint, and a plumbing panel replacement + paint. When I posted the request on Angi, Eugene from Honeycomb Construction called me within a minute after posting (Wow!). I explained my situation (baby on the way/arriving in weeks, nesting) and project details, and Eugene stopped by the same day to get a good look at room needing paint + repairs. Eugene was able to meet my familyâ s needs to get this room ready within one week. Although the estimated job timeline slid out by one day due to factors out of Eugeneâ s control (cold room on the basement floor, so paint takes longer to dry between coats), he did an excellent job with all the promised work: the paints of coat were even and full, the lines between the two colors of paint were crisp and clean, and the baseboard trim was looking sharp! Eugene does great work, heâ s really responsive and communicative throughout the process, heâ s really professional, and he is very kind. I will be hiring Eugene and Honeycomb Construction again for future home projects. Thank you!"
exterior
exterior
exterior
exterior
exterior

+32

Response time1 day
Response rate86%
Recommended by97%of homeowners
Palm Construction and Remodeling Inc.
4.2(
88
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Brinnon, WA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

"Palm Construction recently re-roofed my house and did quick and high quality job at very competitive price. They also cleaned working are and it was a true pleasure to work with them. Special thanks to Lee, project manager. He was professional, honest and helpful."
Response time2 days
Recommended by90%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Brinnon, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
GREAT WALL STUCCO, LLC
New to Angi
Synthetic Stucco - Install or Completely ReplaceTraditional Stucco - Install or Completely ReplaceTraditional Stucco - Repair or Partially Replace

Serving Brinnon, WA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We offer a variety of General Contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!\n\n

Response time1 day
Showing 1-10 of 22
Stucco questions, answered by experts

The curing time for stucco typically takes several weeks to fully complete. During the curing process, the stucco undergoes a chemical reaction and gradually hardens. It's important to note that curing is different from drying. While the surface of the stucco may dry relatively quickly within a few hours or days, the curing process continues beneath the surface, strengthening and solidifying the stucco. 

It's best to avoid excessive moisture exposure during the curing period, as it can impede the curing process. The exact curing time can vary based on factors such as temperature, humidity, and the specific stucco mixture used.

Solid, unpainted stucco shouldn’t suffer damage from dots of glue used for this task. If the stucco is dirty, you may notice slight marks when you heat and peel the glue away, but these aren’t permanent.

However, not all stucco walls are solid stucco. Some are “faux” stucco with a foam backing. This kind of stucco veneer is more susceptible to damage, including damage from hot glue. We don’t suggest attaching anything to these kinds of stucco walls, so make sure you check the stucco type before starting this project.

Stucco applied over brick can last 30 to 50 years or more when correctly applied and properly maintained. Stucco’s lifespan can be shortened by improper application, incorrectly mixed material, lack of preparation before application, and lack of maintenance. To get the most life out of your stucco siding, keep up with maintenance and repair any damage as soon as you discover it. 

Yes, you can screw directly into stucco. Only do so if the item you are installing is a permanent fixture. Drill a pilot hole into the stucco using a masonry or concrete bit, then drive in the screw with a power drill or screwdriver.

You can use small bits that are up to 3/8 inch in diameter, or larger bits that are 1/2 inch or more in diameter. Make sure the bits you use are coated with carbide or diamond; this information is usually visible on the package. You can also use hole saw bits to drill into stucco.

The Brinnon, WA homeowners’ guide to stucco services

From average costs to expert advice, get all the answers you need to get your job done.