Top-rated excavation pros.

Get matched with top excavation pros in Hurricane, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Hurricane, UT?

Select your specific project to find the pro for you.

TRUSTED BY HURRICANE, UT HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon11
    Verified excavation services reviews

Find Excavation pros in Hurricane

Avatar for Down South Construction
Down South Construction
5.0(
5
)
Building Site - Preparation and ClearingLandscape - Minor Grading or ReslopingBuilding Site - Preparation and Clearing - For Business+2 more

Serving Hurricane, UT and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"Down South did a great job, it is nice to have a team that communicates so well. Jared helped through the whole process and kept everything transparent and when your building a home the is refreshing. Justin on the excavator also communicated well and did a great job. Thanks guys. We have another job coming up soon and you are the team we will be calling. Thank you again. Robert and Lisa"
Del Mar concrete removal
13 neighbors recently requested a quote
...
Showing 1-10 of 54
Excavating questions, answered by experts

Errors in site preparation can lead to structural failures or appear costly midway. Professionals ensure detailed, reliable home base development layouts.

It can take several weeks for the ground to settle after removing a tree, and the soil under larger, more mature trees can take months. The deeper the tree has been ground under the soil, the longer it will take to settle. However, this extra depth can help you plant new landscaping sooner because you’ll have more space for fresh soil.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

As a general rule, the protected area should be about 1½ times as wide as the canopy of the tree’s leaves. This digging measurement can vary by tree species and the age of the tree. Of course, that can be a lot of fencing for larger trees, which is why our first step is about making difficult decisions on which trees to save.

The Hurricane, UT homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.