Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Ballard, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Ballard, UT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Ballard

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Ballard, UT and surrounding areas

In business since 1971

Credit card accepted

"AHS is ok. They cover repairs of most everything under the roof of your house. The companies that contract with them are not always the best. You call AHS with the issue, they send a fax to the repair company and give you the contact info. If they don't contact you within 24 hours, you call them. Sometimes they answer, sometimes they don't. When they arrive (usually three days or so later), they service the item. if it has issues within the 90 days, you call AHS again, they are sent out with no charge. If the serviceman decides the unit is unrepairable, AHS will allow you to choose a replacement from their listing (usually not as good as what you have) they will install and remove your old item, or give you wholesale amount to buy and install your own. Prices vary on what you want covered and what you want the copay to be, plus where you live. For me it is 49.99 per month with a 75.00 time of service order. You can have more than one item serviced at the same time under the same fee. If you have a SEAR product the repair guys are great. Not that wild about the other ones they send out. But it is a big savings compared to calling someone on your own. The cost of service is only the 75.00 copay."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

It takes more electricity to run one, so it’s not necessarily cheaper to run a salt water pool. However, the cost difference is relatively minor; it may cost an extra $50 over the course of a year. However, salt costs a lot less than chlorine sanitizers. This lowers the overall maintenance costs for a salt water pool compared to chlorine pools.

While some commercial pools are required to run their pump 24 hours a day, homeowners should not. Running a pool pump for 24 hours a day isn’t necessary to clean the pool water—eight hours is enough. Doing so unnecessarily increases your electric bill and puts more wear and tear on the pump and filter, shortening their lifespan.

It is generally not recommended to place a pool directly on grass. Doing so will kill the grass underneath, and the surrounding lawn may also be damaged by heavy foot traffic and splashes of chemically-treated water. For best results, create a clean, level surface by removing the grass and debris. You can then install a sturdier base using materials like sand, a concrete pad, or solid foam.

In most cases, late May or early June are the most popular times to open a pool, depending on your location. It’s a good idea to open your pool when the outdoor temperature sits consistently above 65 to 70 degrees (F). At this point, algae will begin to flourish in your water, so opening the pool and adding the proper chemicals will avoid excessive pool algae growth.

The Ballard, UT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.