Top-rated basement remodelers.

Get matched with top basement remodelers in Piney Flats, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Piney Flats, TN?

Select your specific project to find the pro for you.

TRUSTED BY PINEY FLATS, TN HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon26
    Verified basement remodels reviews

Find Basement remodelers in Piney Flats

Avatar for Tri-Cities Remodeling Co
Tri-Cities Remodeling Co
4.1(
18
)
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Approved

In business since 2021

Free estimates

Warranties offered

"This company is very professional to work with. Also, they run their company in a very competent manner. The team that worked on our kitchen remodel was there on time every day and worked all day. They did excellent work and I was most grateful they had competent people doing their jobs. I did not want to have to look for my own electricians or plumbers. They have at least five teams that work on different jobs. I am very fortunate that I found Tri-Cities Remodeling. They did an excellent job and I now have a beautiful kitchen."
Bathroom
Kitchen
Living Room
Full Bathroom
Free Standing Tub

+54

Response time1 day
Response rate98%
15 neighbors recently requested a quote
Avatar for HLC Property Management
HLC Property Management
4.6(
48
)
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Approved

In business since 2013

Free estimates

Small jobs welcome

"HLC remodeled my garage and converted it to a photography studio. They did a wonderful professional job, repaired walls, painted, added trim, baseboards, built custom steps, installed a metal wall for magnets, replaced garage door with beautiful French doors, installed new flooring, new light fixture and new keyless entry on two doors. Highly recommend!"
Farnor Garden
soffit fascia repair
retaining wall
before and after removing divider wall
before bathroom

+103

Response time2 days
10 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Trade-Worx
Trade-Worx
4.8(
29
)
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Approved

Super Service Award Winner

In business since 2006

Free estimates

Small jobs welcome

"Brandon did a great job finishing my waterproof laminate floor! He was on time, trustworthy, polite, had good recommendations, and was able to finish early so I could get my house back in order! If you want a fair price and a good job, go with Trade-Worx."
Full view of Porch that was built.
Finished steps
Full view
Lowest Point
Finished steps

+46

Response time5 hrs
Response rate95%
3 neighbors recently requested a quote
Avatar for Trade-Worx
Trade-Worx
4.8(
29
)
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Approved

In business since 2006

Free estimates

Small jobs welcome

Here at Trade-Worx we take pride in our work! Customer satisfaction is the cornerstone of the way we conduct business and strive to complete the perfect job every time. \nWe will SHOCK you with our competitive pricing. Give us a call today for a FREE estimate!!!

Recommended by84%of homeowners
Fox Custom Homes
3.9(
12
)
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

"Words cannot describe how wonderful Shannon and his employees were. He was extremely patient with any changes we had and made sure it was done right the first time. We had him remodel the basement and I am more than pleased with his work. We look forward to using him with other projects in the future!!"
3 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Piper Construction
Piper Construction
5.0(
3
)
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Approved

In business since 2017

Free estimates

Offers commercial services

"Peter the supervisor on my project was wonderful to work with and provided great customer service. The company as a whole was outstanding. Everything was in writing with a one year warranty on their workmanship."
1800's Civil War Home Kitchen Remodel
1800's Civil War Home Kitchen Remodel
1800's Civil War Homee Kitchen Remodel
1800's Civil War Home Kitchen Remodel
My jobs

+18

Recommended by100%of homeowners
Avatar for Fallon Remodeling Inc.
Fallon Remodeling Inc.
New to Angi
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Approved

Free estimates

Credit card accepted

Our goal is to complete your project in a timely and professional manner that will encourage you to recommend us to others ! We provide a clear written estimate beforehand. We'll take daily photos of our work and upload them to an online tool you have access to, making a record of our work. Our focus is using our own full time company employees, not subcontracting your project out to others, as so many do. We are a veteran owned and operated company (16 years military service). We have a Tennessee BC-A general contractor license, the top tier in the state (and only level requiring passing multiple state exams.) Always verify your contractor has a valid state license at http://verify.tn.gov/\n

13 neighbors recently requested a quote
Cornerstone Design Build Group, Inc.
0.0(
1
)
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Approved

In business since 1979

Credit card accepted

Cornerstone Design Build Group, Inc., is a full service contracting company. We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer�s needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time3 days
Recommended by100%of homeowners
Avatar for Maintenance Management and Remodeling
Maintenance Management and Remodeling
5.0(
18
)
Basement - Remodel

Serving Piney Flats, TN and surrounding areas

Emergency services offered

Credit card accepted

"The Lord has blessed us with Stephen and Maintenance Management and Remodeling. I hope that this can be the start of something great! They will take care of you!"
Handymen Project
Remodeling - General Project
Handymen Project
Housecleaning Project
Landscaping Project

+166

Response time5 days
Response rate100%
Recommended by100%of homeowners
...
Showing 1-10 of 57
Basement Remodel questions, answered by experts

For most basement remodels, you’ll want to hire a general contractor. This is for a number of reasons, but the main two are that general contractors have dedicated teams they are comfortable with, and hiring one means you only have to deal with one pro. You may also get a better project quote since they can lump all their work and subcontracting into a single quote. 

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Walkout basements cost more than other kinds of basements, and can also increase your risk of leaks as well as a loss of insulation, leading to higher heating and cooling costs. Improperly installed walkout basements may lead to structural issues with your foundation, so ensure you’re working with a contractor who has extensive experience with this kind of basement.

The Piney Flats, TN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.