Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Chester, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Chester, PA?

Select your specific project to find the pro for you.

TRUSTED BY CHESTER, PA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon482
    Verified backsplash installation services reviews

Find Backsplash installation pros in Chester

Avatar for Fabiano's Construction
Fabiano's Construction
4.8(
74
)

Serving Chester, PA and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Small jobs welcome

"They did very good on my bathroom remodel. Before my bathroom was a mess and looked outdated. Now, it looks more modern. I really like how they did the tiles."
decks
decks
decks
decks
decks

+6

Response time4 days
Response rate100%
7 neighbors recently requested a quote
Avatar for SRL Tile Works
SRL Tile Works
4.5(
53
)

Serving Chester, PA and surrounding areas

Approved

Super Service Award Winner

In business since 2000

Free estimates

Warranties offered

"Sam installed a glass tile backsplash for me in my kitchen. It wasnâ t the easiest glass tile to work with but he did a great job! It came out fabulous!!!"
first floor remodel
first floor remodel
first floor remodel
12x24 marble
12x24 marble

+158

Response time6 hrs
Response rate96%
16 neighbors recently requested a quote
Avatar for PG Tedesco Construction
PG Tedesco Construction
4.4(
90
)

Serving Chester, PA and surrounding areas

Approved

In business since 1986

Free estimates

Emergency services offered

"PG Tedesco did an excellent job remodeling our bathroom. The team was courteous, easy to work with, and cleaned up thoroughly at the end of each day. They worked with difficult materials- glass tiles - and created a beautiful new bathroom for us. I highly recommend them."
BEFORE
AFTER
House
House
House

+2

Response time2 hrs
Response rate100%
Recommended by75%of homeowners
Avatar for One Smart Project LLC
One Smart Project LLC
5.0(
16
)

Serving Chester, PA and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

"Very prompt response to my inquiry. They did not need to come out to estimate the flooring installation, just from photos and my measurements. They were able to come out the next day. Installers were also prompt and efficient. Cleaned up after themselves and the work quality is very good. Would definitely use them again."
Instalaciones
Response time5 hrs
Response rate100%
70 neighbors recently requested a quote
Avatar for ADJ Construction, LLC
ADJ Construction, LLC
5.0(
13
)

Serving Chester, PA and surrounding areas

Approved

Super Service Award Winner

In business since 2019

Free estimates

Small jobs welcome

"Diego did an incredible job on our shower! We had to replace the floor and deep clean & seal the surrounding slate. Diego was detailed oriented, and generally great to have in our home. Would highly recommend ADJ construction and we will absolutely use Diego & his team again"
Standing shower project 2023
Modern Chimene
Modern restroom floor
Modern restroom floor
Double standing shower and tub

+22

Response time1 day
Response rate99%
17 neighbors recently requested a quote
...
Showing 1-10 of 443
Backsplash Installation questions, answered by experts

Technically, you can start tiling in a corner and work your way out. However, it's not traditionally how tiling is done. Instead, work from the bottom middle of the wall. Tile out the entire row with whole tiles before moving on to the next row. Once you finish installing all of the whole tiles, then you focus on tiling the corners.

Per the International Code Council, walk-in shower floors should have a minimum slope of 1/4-inch per foot (or a 2% slope) towards the drain. The slope should be no steeper than 1/2-inch per foot (or a 4% slope). This helps safely direct water into the drain rather than all over your bathroom.

When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.

On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.

If you’re handling your tile removal yourself, seal the room using painter’s tape and heavy-duty contractor bags to prevent dust and shards from escaping. Use a claw hammer or a pry bar and a mallet to get behind the tile and pry it away from the floor or wall. Once your tiles are all removed, sweep everything into contractor bags for disposal, being careful not to overfill them. Make sure you wear a dust mask, safety goggles, and work gloves to keep yourself safe from injury while you work.

Installations typically take 1-3 days, depending on area size; repairs are usually completed sooner if the issue is localized.

The Chester, PA homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.