Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Breezewood, PA

Enter your ZIP and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Breezewood, PA?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Breezewood



Avatar for Central PA Safe Surface Technologies, LLC

Central PA Safe Surface Technologies, LLC

266 Gregory Drive
No reviews yet

Central PA Safe Surface Technologies, LLC

266 Gregory Drive
No reviews yet
10 years of experience

Approximately every 8 seconds in the USA there is another slip and fall related incident. Safe Surface Tech. consults with businesses in order to prevent slip and fall related accidents and performs work related to those consultations. Our goal is to decrease the number of slip and fall injuries and accidents in work and home environments through prevention. This can be done by increasing friction/traction on flooring and walkway surfaces, decreasing tripping hazards, increasing lighting where needed and by many other means.

Approximately every 8 seconds in the USA there is another slip and fall related incident. Safe Surface Tech. consults with businesses in order to prevent slip and fall related accidents and performs work related to those consultations. Our goal is to decrease the number of slip and fall injuries and accidents in work and home environments through prevention. This can be done by increasing friction/traction on flooring and walkway surfaces, decreasing tripping hazards, increasing lighting where needed and by many other means.



LR Roofing Systems, LLC

1115 Salemville Rd
No reviews yet

LR Roofing Systems, LLC

1115 Salemville Rd
No reviews yet
17 years of experience

We are a full service roofing contractor specializing in flat and low pitched roofing, new retrofit and replace or repair. We are warranty trained to install and warrant Conklin Roofing Systems.

We are a full service roofing contractor specializing in flat and low pitched roofing, new retrofit and replace or repair. We are warranty trained to install and warrant Conklin Roofing Systems.



BRAD GORDON WATERPROOFING AND GENERAL CONTRACTOR

1814 BLACK OAK ROAD
1.00(
1
)

BRAD GORDON WATERPROOFING AND GENERAL CONTRACTOR

1814 BLACK OAK ROAD
1.00(
1
)
25 years of experience

General contracting specializing in waterproofing. Renovations, repairs, and new install. No need to have different contractors for each phase. We offer just about whatever you need at reasonable prices and quality workmanship.

General contracting specializing in waterproofing. Renovations, repairs, and new install. No need to have different contractors for each phase. We offer just about whatever you need at reasonable prices and quality workmanship.


Rolyn Companies

7 Crozerville Rd
1.00(
1
)

Rolyn Companies

7 Crozerville Rd
1.00(
1
)
17 years of experience

For more than 30 years Rolyn has helped property owners and managers through major disasters, everyday emergencies, and reconstruction, providing a full range of property damage restoration and reconstruction services to properties of all types. As one of the nation’s leading disaster restoration and reconstruction contractors, Rolyn has the skilled manpower, equipment and financial resources of a large company, but the agility, responsiveness, and personal service you expect from a smaller firm.

For more than 30 years Rolyn has helped property owners and managers through major disasters, everyday emergencies, and reconstruction, providing a full range of property damage restoration and reconstruction services to properties of all types. As one of the nation’s leading disaster restoration and reconstruction contractors, Rolyn has the skilled manpower, equipment and financial resources of a large company, but the agility, responsiveness, and personal service you expect from a smaller firm.


kieffer construction

246 Hudsondale St
1.00(
1
)

kieffer construction

246 Hudsondale St
1.00(
1
)
36 years of experience

In business twenty five plus years,we offer very fair prices in todays economy,discounts offered for,senior citizens,military,and return clients.All work done in a timely manner.Satisfaction guaranteed.

In business twenty five plus years,we offer very fair prices in todays economy,discounts offered for,senior citizens,military,and return clients.All work done in a timely manner.Satisfaction guaranteed.


Playground Rubber Safety Surfacing, Deck Restoration, Gym Floors, Sport Surfaces, Playgrounds, and many other recreational applications.

Showing 1-10 of 13
Epoxy Flooring questions, answered by experts

Avoid steam cleaning unsealed hardwood, vinyl, and laminate floors unless the manufacturer explicitly states that a steam mop can be used.

If you also need to know how to fill the gap between the floor and the baseboard, it's best to use a flexible, paintable latex caulk. Clean the area thoroughly to remove dust and debris. Then, apply a smooth bead of caulk along the gap using a caulking gun, and use a caulk-smoothing tool to press and smooth it into place. If the gap is large, you may need to insert backer rod, such as a foam filler, before caulking. Once dry, paint the caulk to match the baseboard for a clean, seamless look.

Flooring transition strips can be glued, nailed, or screwed to the subfloor. Gluing has a cleaner finish, but screwing and nailing will result in a more secure installation.

Carpeting a room is less expensive than installing laminate flooring on average. However, the final cost will depend on your chosen materials and labor considerations for a complicated room layout or stairs. The cost for carpeting jobs can quickly meet or even exceed that of laminate if you choose very high-quality materials for a large space. Keep in mind that carpet also needs padding underneath, which adds to overall project costs.

Laminate flooring takes about 24 to 48  hours to settle. Before this, planks are not completely acclimated to your home, and walking on them could cause shifting and permanent damage to the flooring. You should allow floorboards to acclimate for 48 to 72 hours before installing so that they can adjust to your home’s humidity and temperature levels, but they will continue to acclimate and settle after installation. For this reason, avoid placing any furniture in the room for 72 hours after installation.

Your floors will continue to settle for a few months after installation, becoming less bouncy as they rest.

The Breezewood, PA homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.