Top-rated subcontractors.

Get matched with top subcontractors in Riddle, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Riddle, OR?

Select your specific project to find the pro for you.

TRUSTED BY RIDDLE, OR HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon133
    Verified subcontracting services reviews

Find Subcontractors in Riddle

Avatar for Berper Construction LLC
Berper Construction LLC
5.0(
8
)
Major Home Repairs (General Contractor)

Serving Riddle, OR and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Phone call on Thursday, Geraldo came over on Friday to check the job & agreed on price. He arrived on Monday morning & work was all done on that day. Prompt & professional. We are very happy with the repairers done on our home & we would not hesitated to hire him again for any work we need done at our home."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+38

Recommended by100%of homeowners
Avatar for C&S Contracting
C&S Contracting
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Riddle, OR and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"New floors look great and they did well even with having to put in an inferior hardwood product - “seconds” which I didn’t know when I purchased. Oak with an unusual finish I love though was challenging to install because not uniform. I have electric now for pendant lighting over an eating bar, and they changed my fixture in dining room. Well done!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Recommended by100%of homeowners
Avatar for Mid Valley Building LLC
Mid Valley Building LLC
3.6(
47
)
Major Home Repairs (General Contractor)

Serving Riddle, OR and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"They had to come back to repair a couple of the leaks they had previously repaired. This time  it was the owner who showed up.This time he stated that we needed a new roof at a pretty considerable cost.I think it wad probably a fair estimate but unable to afford it at this time."
Chesire Home
Eugene Roof
Exposed Aggragate
Paul's Job
Kevin's Job

+5

Recommended by75%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Riddle, OR and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 36
Subcontractors questions, answered by experts

The process typically takes 2-6 weeks, depending on the project size and level of customization.

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

It is technically possible to draw your own blueprints, but the process is extremely involved and really demands help from an expert. A professional architect has an understanding of design elements, interior design, the functionality of different rooms in a home, and how everything from furniture, outlets, and light switches should be laid out to serve you and your family best. Hiring an architect for blueprints can get expensive, but it’s the most responsible way to begin a new construction project. If you’re keen on DIYing, you could consider starting the process and then having a professional take over.

Yes, designing builds to fit space constraints and meet functional needs.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The Riddle, OR homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.