Top-rated subcontractors.

Get matched with top subcontractors in Glendale, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Glendale, OR?

Select your specific project to find the pro for you.

TRUSTED BY GLENDALE, OR HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon25
    Verified subcontracting services reviews

Find Subcontractors in Glendale

Avatar for Berper Construction LLC
Berper Construction LLC
5.0(
8
)
Major Home Repairs (General Contractor)

Serving Glendale, OR and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Phone call on Thursday, Geraldo came over on Friday to check the job & agreed on price. He arrived on Monday morning & work was all done on that day. Prompt & professional. We are very happy with the repairers done on our home & we would not hesitated to hire him again for any work we need done at our home."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+38

Recommended by100%of homeowners
Avatar for C&S Contracting
C&S Contracting
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Glendale, OR and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"Truly one of the most professional and hard-working contractors I have seen. They have been very thorough with the job, the preparation to paint on our old house that has been needing a new coat of paint for a long time has been extensive and most certainly not haphazard. There are so many different places where the wood has rotted out and they continue to take that all out and replace where needed like a professional job should be done. I have seen many contractors brush these types of things over due to the extra amount of work it takes, but that is not these guys. This company will make sure a job is done right! On a personal note, I also have a baby I need to put down for a nap each day, and they have been so understanding to work on the other side of the house and keep quiet until my baby wakes up. HUGE thank you to this company and their skill, professionalism, and positive attitudes."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Glendale, OR and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 34
Subcontractors questions, answered by experts

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

When conducting space planning, building codes and regulations need to be considered. As long as you are taking them into account and discussing them with the architect, you should be able to do your space planning appropriately.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

The Glendale, OR homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.