Top-rated basement remodelers.

Best basement remodelers near Dayton, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dayton, OR?

Select your specific project to find the pro for you.

TRUSTED BY DAYTON, OR HOMEOWNERS

  • Average homeowner rating star icon3.7
    Average homeowner rating
  • Verified reviews icon19
    Verified basement remodels reviews

Top-Rated Basement remodelers in Dayton - Updated Nov 2026

Avatar for Be Home Remodeling
Be Home Remodeling
4.9(
7
)
Basement - Remodel

Serving Dayton, OR and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"Reuben was the nicest guy I met with and will keep his number for future jobs. This company does everything small or whole home remodeling. I was impressed by his knowledge and spirit."
Response time1 day
Response rate100%
303 neighbors recently requested a quote
Avatar for Elite Enclosures
Elite Enclosures
4.4(
35
)
Basement - Remodel

Serving Dayton, OR and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Credit card accepted

"Adam and his crew did amazing work going above and beyond expectations. Went out of his way to pickup things that were missing out of the shed kit. It was very appreciated that he picked up a vapor barrier so the shed would be built to last. Great communication and even better price. Wouldn't hesitate to recommend to a friend and/or use on future projects. Thanks Adam!"
Painting - Exterior Project
Handymen Project
Painting - Exterior Project
Handymen Project
Painting - Exterior Project

+1

Response time1 day
Response rate100%
3 neighbors recently requested a quote
Avatar for Elm Construction Services, Inc.
Elm Construction Services, Inc.
4.3(
34
)
Basement - Remodel

Serving Dayton, OR and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"I just want to say thank our project manager Max! He was on top of things and kept the project moving smoothly! I can’t express how stress free this remodel went compared to other remodels I’ve done. He communicates clearly, and followed up regularly. I’m just so impressed with how my new kitchen looks. From the blue prints to real life it’s exactly what I wanted and imagined. Thank you thank you!"
GAF Roof Installation
GAF Roof Installation
GAF Roof Installation
GAF Roof Installation
GAF Roof Installation

+27

Response time5 hrs
Response rate99%
705 neighbors recently requested a quote
Avatar for MRI Construction Services
MRI Construction Services
4.1(
39
)
Basement - Remodel

Serving Dayton, OR and surrounding areas

Approved

In business since 2015

Free estimates

Credit card accepted

"Shannon was very responsive, went out of his way to gather our supplies during a run on that type of lumber, completed te work efficiently , was neat, and provide straight-forward advice on how to maintain the pergola.. I got three bids from other Home Advisor recommendations and his was the lowest."
Doors
Doors
Doors
Doors
Doors

+196

Response time8 hrs
Recommended by70%of homeowners
Avatar for The Renovation Company
The Renovation Company
4.5(
73
)
Basement - Remodel

Serving Dayton, OR and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"I have lived in this house for 25 years, and the only project I truly feared was siding.  I have made LOTS of changes to the property  over time, but always stopped short of siding.  This was a scary project, but I signed-up because of Fine Finish Remodeling's reputation on Angie's list, etc.   Also, the siding REALLY needed to be replaced -- in some areas, it was practically held together by paint.  Other exterior improvements (roof, front door and garage door) were being done by other contractors, during the same time period.

-- Mark Stevens is owner / contractor of Fine Finish Remodeling.  He did an excellent job of communicating and moving this project along, and referring out to others as needed.  The supervisor,  Kevin Dunsworth was great, and the house shows that. 

-- Delays happened, because they do.  The contractor had some issues. The weather was sometimes lousy.  PARR lumber delivered some of the materials to somewhere else, which stopped work for about a week.  Holidays happened. People had illnesses.   Siding work stopped while  the roof was repaired and replaced (2 days).  ETC.   In general, I was impressed to watch the changes take shape.  I believe it all moved along as quickly as it could.

--I was part of the problem too.  Two different garage door companies had volunteered their opinion that I could have one BIG garage door, rather than 2 smaller doors, if I wanted to do that.  It would be no problem, according to them.  I talked to Mark, about this, and he told me what could happen if the garage door men were wrong, and recommended I consult a  structural engineer first.  He gave me a name; I called; and the short version is a huge new beam was needed.  It took 6 men to lift that into place.  The final garage door outcome is perfect. Many thanks to Mark for coordinating the extra work my super-sized garage door required.

--Logistically, the siding was removed and replaced from sides and back of house first, leaving the street appearance somewhat intact until the end.  Hardie Plank siding comes with color, but the trim is just primed, so my family did a lot of painting in our garage, and other locations.  Kevin was kind enough to give warning when there was trim to paint for an inside angle, since that would have been nasty to do after it was installed.  I had one area outside the master bedroom that had always looked strange, for the way the old trim and siding met under the eaves.  I pointed that out, and Kevin fixed it with the new trim and siding. 

--When the house was finished, it was slightly wider than it used to be, sufficiently that the downspouts no longer fit. Mark gave me the names of area gutter companies, and the first one came right out and made new downspouts and cleaned the gutters too for a great price.

--The house exterior is done, and it looks great-- and the street noises are much quieter, and odd drafts are gone.  My scary project turned out to be a good experience with a happy outcome."
Recommended by89%of homeowners
Avatar for Robert Paul Heckel jr
Robert Paul Heckel jr
5.0(
14
)
Basement - Remodel

Serving Dayton, OR and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"Beautiful work done by people who care. I had an old deck torn out and a new one built. The work is impeccable. Rob was accommodating as far as changes and special requests. His crew was on time and very easy to work with. Good communication and close attention to detail. I love my new deck. I will certainly hire them again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+180

Recommended by100%of homeowners
...
Showing 1-10 of 111
Basement Remodel FAQs, answered by experts

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

The Dayton, OR homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.