Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Shattuck, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Shattuck, OK?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Shattuck

Avatar for Roger Allen Restorations & Homes
Roger Allen Restorations & Homes
4.3(
19
)

Serving Shattuck, OK and surrounding areas

In business since 1947

Free estimates

"It was great, I'm looking at it now, it's gorgeous. The people who built it were fabulous. In terms of pricing, he was near the bottom of some of the others. He wasn’t the lowest, but he was near the bottom. In terms of the quality of the product, I couldn’t be happier. I love the quality. I would absolutely recommend them. They did a really nice job. In fact, whilst it was near the cheapest, nothing was skimped."
A small portion of a custom kitchen
Another kitchen with glass and enviroglass countertop
A million dollar foyer...
Installed Travertien after reinstalling a new concrete shower pan
The final finish

+2

Recommended by72%of homeowners
Avatar for Leon Brothers, LLC
Leon Brothers, LLC
5.0(
2
)

Serving Shattuck, OK and surrounding areas

In business since 2022

Free estimates

Offers commercial services

Leon Brothers LLC is the leader in providing our customers with the highest quality service in an honest, efficient, and professional way. Our pledge is to create successful relationships with our customers, employees and community by building trust, treating every project with the utmost integrity and exceeding expectations. We look forward to working with you!\n

Response time2 days
Recommended by100%of homeowners
Avatar for DKM Builders
DKM Builders
5.0(
1
)

Serving Shattuck, OK and surrounding areas

In business since 2024

Free estimates

Credit card accepted

DKM Builders is a locally owned and operated construction company proudly serving Bucklin, Kansas, and the surrounding communities. Built on a foundation of quality craftsmanship, integrity, and local knowledge, we are committed to delivering reliable and high-quality construction solutions for residential, commercial, and agricultural clients.

Response time1 day
2 neighbors recently requested a quote
Showing 1-10 of 30
Asphalt Driveways questions, answered by experts

If you’re looking for a similar, eco-friendly driveway material, you might consider one of these options:

  • Permeable pavement: This material is sometimes called “pervious” or “porous” pavement; it allows stormwater to drain into the subbase, eliminating storm drain costs. 

  • Gravel: Consider paving your driveway with locally sourced gravel. By sourcing from a nearby source, your money won’t fund international shipping and will be invested back into your local community.

  • Natural stone pavers: Because natural stone pavers are made from organically-produced stone, there’s no new manufacturing required, limiting the environmental impact. In addition, water easily flows and drains through the gaps in the pavers.

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

Yes, recycled asphalt driveway costs can be substantially lower than new asphalt. With new asphalt costing between $90 and $190 per ton, this option can cost as much as 10 times more than laying down asphalt millings.

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Shattuck, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.