Top-rated subcontractors.

Get matched with top subcontractors in Roland, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Roland, OK?

Select your specific project to find the pro for you.

TRUSTED BY ROLAND, OK HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon203
    Verified subcontracting services reviews

Find Subcontractors in Roland

Avatar for Hixon Custom Construction
Hixon Custom Construction
New to Angi

Serving Roland, OK and surrounding areas

Approved

In business since 2021

Free estimates

Warranties offered

Hixon Custom Construction is a locally owned and operated company that values honesty and integrity in all aspects of our business. Our dedicated team of professionals have over 4 years of hands on experience to provide innovative ideas and suggestions tailored to your projects. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today! \n

Response time2 hrs
Response rate100%
Avatar for Multiples Services
Multiples Services
4.9(
14
)

Serving Roland, OK and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"Ariel and his crew were excellent. I was very pleased with the work they did for us. They did a great job in a timely manner. They were thorough with their work and always showed me what they accomplished for the day as well as what they would be working on the next day. They painted a few rooms, removed wallpaper, painted ceilings & painted washroom cabinet's. Ariel offered alternatives & suggestions. I would definitely use theirs services afdd again."
Exterior Paint
Bathroom Renovation
Exterior Paint
Exterior Paint
Bathroom Renovation

+40

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Roland, OK and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 52
Subcontractors questions, answered by experts

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

You don’t have to commit to a complete home renovation to age in place comfortably—those can get pricey. Instead, focus on a few impactful changes. Consider adding a stair lift or installing ramps to eliminate barriers. Upgrading to non-slip flooring can prevent falls while adding brighter lighting can improve visibility throughout your home. These thoughtful updates can make your home much easier to navigate and enhance your comfort and safety without the stress and cost of a complete overhaul.

It is technically possible to draw your own blueprints, but the process is extremely involved and really demands help from an expert. A professional architect has an understanding of design elements, interior design, the functionality of different rooms in a home, and how everything from furniture, outlets, and light switches should be laid out to serve you and your family best. Hiring an architect for blueprints can get expensive, but it’s the most responsible way to begin a new construction project. If you’re keen on DIYing, you could consider starting the process and then having a professional take over.

Yes, professionals will offer tailored solutions to fit architectural and personal style preferences.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Roland, OK homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.