Top-rated subcontractors.

Get matched with top subcontractors in Moore, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Moore, OK?

Select your specific project to find the pro for you.

TRUSTED BY MOORE, OK HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon3.1k+
    Verified subcontracting services reviews

Find Subcontractors in Moore

I.Lopez Construction
5.0(
15
)
Major Home Repairs (General Contractor)

Serving Moore, OK and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

"They were prompt on both mornings they worked putting down tile one day and laminate flooring the next day. They cleaned up their work area before leaving the first day and by the end of the second day our home was back to it's new and improved self. The quality of work was A+. I will definitely call them for my next project."
Bathroom remodel
Bathroom remodel
Bathroom remodel
Recommended by100%of homeowners
TLC Renovations Inc
5.0(
6
)
Major Home Repairs (General Contractor)

Serving Moore, OK and surrounding areas

Approved

In business since 2019

Free estimates

Warranties offered

TLC Renovations Inc gives you top-quality remodeling services. For more information about our pricing, feel free and give us a call.\n\nWe serve in Norman, OK, Pink Town OK; Choctaw OK; OK; Noble OK; Harrah OK; and the surrounding areas.\n\nBasement Remodel, Remodeling Service, Affordable Bathroom Renovation, Complete Kitchen Remodeling, Professional Home Remodeling\nReliable Basement Remodel, Dependable Remodeling Service, Affordable Kitchen Renovation,Complete Bathroom Remodeling, Professional House Remodeling\n\nFor more information visit our website: https://remodelernormanok.com/

3 neighbors recently requested a quote
Strong Oak Solutions LLC
New to Angi
Major Home Repairs (General Contractor)

Serving Moore, OK and surrounding areas

Approved

Free estimates

Small jobs welcome

Offers commercial services

With over 9 years of hands-on experience, I take pride in delivering high-quality workmanship and dependable service on every project. Customer satisfaction is my top priority, and I am committed to ensuring each job is completed to the highest standard.\nI believe that clear and consistent communication is key to a successful project, and I work closely with every customer from start to finish to make sure expectations are met and exceeded. Whether it’s a small repair or a large project, no job is too big or too small—I approach every task with the same level of professionalism and attention to detail.\nMy goal is to complete all work in a timely manner without compromising quality, providing reliable, efficient, and professional service you can trust.

Bathroom Remodel
Bathroom Remodel
Bathroom Remodel
Bathroom Remodel
Kids bunk beds

+13

35 neighbors recently requested a quote
...
Showing 1-10 of 266
Subcontractors questions, answered by experts

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

By providing precise guidelines that reduce errors and facilitate smooth execution.

Building permits serve a few purposes, the most important of which is to keep you and the people around you safe by ensuring your contractor does work safely and to code. Permits also help your municipality tax your property appropriately, as taxes are based on land improvements and the upgrades you make to your home. Finally, permits ensure your project won’t have a negative impact on the environment or your neighbors.

Blueprints are generally available for houses built after the early 1900s. Before then, detailed building schematics like blueprints were rarely used and even more rarely saved. If you have an older house and need blueprints, you can have a new set drawn up by an architect or draftsperson.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Moore, OK homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.