Top-rated paving pros.

Get matched with top paving pros in Boley, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Boley, OK?

Select your specific project to find the pro for you.

Find Paving pros in Boley

Avatar for A to Z Asphalt Construction
A to Z Asphalt Construction
4.7(
41
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Boley, OK and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Great local company with exceptional service, quality and cost. First class work at a price we were happy with. Service was top notch with excellent communication throughout the process. Highly recommended Asphalt Construction!!"
Response time2 days
Response rate91%
Recommended by65%of homeowners
Showing 1-10 of 47
Paving Services questions, answered by experts

Compared to a 10x20 concrete driveway costing between $800 and $3,000, a resin bound driveway of the same size costing $3,900 to $4,000 is the more expensive option. However, the cost still makes resin a cheaper option compared to a 10x20 paver driveway costing an average of $12,000.

Three inches is a great thickness for a residential asphalt driveway that sees minimal to moderate traffic from cars, SUVs, and pickup trucks. However, a thicker driveway can better withstand the weight of a heavier vehicle, such as a trailer or a recreational vehicle. If you drive a heavy vehicle on a thin driveway, you risk cracking and damaging it.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Although you could try to lay stepping stones directly over grass, which speeds up the installation process significantly, this method often leads to a poor result over time. Even heavy paver stones will eventually slide or shift on top of the grass. Digging into the ground and following the steps we listed is the best way to lay stepping stones for a long-lasting result.

The layer of polymeric sand under the pavers plus the polymeric sand that gets swept into the joints between your pavers holds them in place in a few ways. For one, the gritty texture of the sand helps lock the pavers together. Polymeric sand also contains bonding agents that get activated by water. Polymeric sand will take between 24 and 48 hours to fully cure, so do not walk on your paver walkway before this time.

The Boley, OK homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.